My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4815 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
4815
>
4815 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 4:44:56 PM
Creation date
2/9/2017 4:44:02 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JP Morgan Chase Apn129, 2010 <br /> Geotechnical lnvestigafion <br /> Proposed Chase Bank Everetf, WA PSI Report No. 0704186 <br /> occurred. We offer the following comments and recommendations for purposes of footing <br /> design and construction. <br /> Footing subgrade soil should consist of inedium dense to very dense silty sand or silty/sundy <br /> gravel. Footings should not be cast on loose, soft, or frozen soil; slough; construction debris <br /> irom demolition; organic materials, existing uncontrolled fill; or surfaces covered by standing <br /> water. Care should be exercised so that no large pieces of construction debris remain in the <br /> subgrade level after demolition. Large chunks of concrete and asphalt should be removed and <br /> disposed of off-site. Should unsuitable soil be encountered during footing excavations, those <br /> soils should be removed and replaced with granular structural fill. <br /> Continuous wall and spread footings should be proportioned for an allowable bearing pressure <br /> of 3,000 psf. The maximum extreme frosl depth in the Everett, Washington area is on the order <br /> of 8 to 10 inches bgs. Continuous wall foundations should be at least 18 inches wide. The <br /> bottom of exterior footings should be at least 24 inches below the lowest adjacent final grade. <br /> The bottom of interior footings should be placed at least 12 inches below the bottom of the floor <br /> slab. <br /> The recommended �Ilowable bearing pressure applies to the total of dead plus long-term live <br /> loads. The allowable bearing pressure may be increased to 4,000 psf for short-term loads, such <br /> as those resuiting from wind or seismic forces. <br /> In view of the pre-consolidated nature of the on-site soils within the existing Hollywood Video <br /> structure footprint, estimates of static set:tlement for the new bank structure are less than one <br /> inch total. Differential setilement should �eneratly be less than one half of totai settlement. <br /> 4.7 LATERAL RESISTANCE FOR FOOTINGS <br /> Lateral loads of the proposed buildings founded on a suitable granular (sand or gravel) material <br /> can be resisted partially or completely by frictional forces developed between the base of the <br /> spread footings and the underlying granular material. The total shearing resistance between the <br /> foundation footprint and the soil should be tak�n as the normal force, i.e., the sum of all vertical <br /> forces (dead load plus live load) times the coefiicient of friction between the soil and the base of <br /> the footing. We recommend using lhe Coefficients of Friction provided in Tabfe 2. If addilional <br /> lateral resistance is r�q�ired, passive earth pressures against embedded footings or walls can <br /> be computed using a prrssure based on an equivalent fluid with a unit weight of 250 pcf. This <br /> value assumes the bar,kfill around foolings will be placed as granular structural fill or the <br /> footings were cast in neat-formed excavations and the sur�sce of the area in front of the footings <br /> will be horizontal in eil;�er case. <br /> r�rtr <br /> N�� 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.