My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4925 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
4925
>
4925 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 6:30:39 PM
Creation date
2/9/2017 6:29:42 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4925
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Deptrtment <br /> Utilities Division <br /> COST ESTIMATE SHEET 3200 Cedar Strat <br /> Everett,Washineton 98201 <br /> (206) 259-8800 <br /> Receipt i! --------- Date Paid <br /> X Cost of`Nod:Crde: � __%yG^^ Work Order i{ 7iU-�i9 677-�SyY <br /> Cos[ �C Sm��^.c Otder `_ ,_ Service Order# <br /> Contsct Person Bub Lantxr� Telephone # 989-5766 pager <br /> Requested By Paul Mekte Date of Request 7/8l94 <br /> Property O�iTer(namc) Olson's Market <br /> Charge Cost to(name if diBcrent than owncr) same <br /> Addras 320 lO8th NE Suile 40G Cily Bellcwe Zip _ S3004 <br /> Installation I,ocation d919 Ever�:reen Wav Everctt 98201 — <br /> ; Installation q�pe/description/size/etc. Set ecisting hvdrant to final grade <br /> I <br /> I The iollowing esUmate is bascd upon the Utilities Division providing all labor,equipment, materials,restoration,and <br /> ❑X final hook-up. <br /> ❑ The folloNing estimate is based upon the S:rcet Divi;iun work group providing all labor,equipment,materials and <br /> restoradon to property. <br /> Whenever the cstimateJ wst is not sufficicnt ta co�•cr thc total expcnsc for labor, matcrial, cyuipment rental and <br /> administrative costs,the deficit shlall be charged to the property for whict such installation was made and the owner <br /> ' thcrco�and provided furtheq that any czccss papment shn116c returned to thc person apply�ing for thc installution. <br /> Itemiud Cost Estimatc: <br /> Labor&Overhead S 688.00 cc: Bldg.Pertn:t Counter <br /> Clair Olivers <br /> Material 920.00 Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental 188A0 Kirk Brooks <br /> Gordon Witchcr <br /> ; 5udaaRestoration Dan'.owell <br /> Stan Mitcheil <br /> TOTAL S 1796.00 <br /> Prepared by: — <br /> Accepted by: _ _ __ Representing: <br /> PORMSJCEM.'IA(Y139Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.