My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5209 EVERGREEN WAY CARNICERIA 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
5209
>
CARNICERIA
>
5209 EVERGREEN WAY CARNICERIA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 7:46:56 PM
Creation date
2/9/2017 7:46:50 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5209
Tenant Name
CARNICERIA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> Subject: Proposed l:arniceria Los Compadres, 5321 Evergreen Way, ::vereU <br /> June 23,2011 <br /> Page 2 <br /> 12. Gxtra �vall protection is required on walls behind all sinks, including restroom handwash sinks, and 1'ood <br /> preparation co:mters and tables. A 16-inch high backsplash of plastic laminate, fiberglass-reinforced plasti:; or <br /> equal is acceptable. A backsplash higher than 16 inches is :equired on the wall bchind counter top equip:,ient <br /> talle� than 16 inches. Wall protection behind mop sinks must cover the entire splash zone. Plastic co�ted <br /> hardboard is not acceptable. <br /> 13. All floors in the kitchen,food preparetion, food service, food storage, and dishwashing��reas must be surfaced <br /> with a durable, nonabsorbent, easily cleanable material. Expansion joints, seams, saw cuts and the like in <br /> concrete floors in all areas, including customer seating areas, must be filled and sealed so as to provide a <br /> sinooth and cleanable surface. <br /> 14. The ceiling above the food preparation areas must be non-perforated, nonabsorbent, smooth and easily <br /> cleanable. <br /> I5. All light fixtures in food preparation and storage areas must be provided with covers or sharierproof bulbs. <br /> 16. Plumbing must meet state and local codes. <br /> 17. The ventilation system shall be installed and operated to meet applicable bu�lding,mechanical, and fire codes. <br /> A preoperational inspection is required prior to operating permit issuance and approval to open for <br /> business. At the time of inspection the construction of the Food service establishment must be complete and all <br /> equi�;ment must be in place and in proper operating condition. Incomplete construction or equipment operation <br /> may res.�lt in a $160.00 reinspection fee. Requests for a preoperational inspection must be received at least <br /> one week in advance of the date being requested for the inspection. Contact the Food Pragram office a <br /> minimum of one week in advance to schedule an appointment for the preoperational inspection. The <br /> preoperational inspection will ensure compliance with the ieules and Re ulations of the State Board of Health for <br /> Food Service Sanitation. <br /> Changes or additions to the approved plans or equipment require pre-approval from the Snohomish Health <br /> District prior to implementation of the changes. <br /> Please contact me if you I:ave any questions. My office number is 425.339.5250 and my email address is <br /> rhoppn(a��hd snohomish.w�.cov. <br /> Sincerely, <br /> Rob A Hoppa, . . <br /> Gnvironmental Ith Specialist <br /> �ood Establishment Plan Review <br /> RH/mem <br /> Enclosure: Food Establishtnenl Onerating Permit Application and Fee Schedule <br /> ec: City of Everett Building Department <br /> Christina Stringcr, R.S., Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.