Laserfiche WebLink
TION FOR DEVELOPER: <br /> INFORMA <br /> The following ir�fortnation is provided for the developers ben�t. These ere not SEPA <br /> condittons. fJl requirements are preliminary in nature, and are based upon the i <br /> preliminary site plan and the ordinances in effect at time of submittal for SEPA revlew. <br /> The �roposal must comply with all oMinances in effect at the dme a complete <br /> build(np pertnit appllcedon is flled, includinQ thoss not speciflcally set forth <br /> herein. (Exception: For vesting under the Zoning Code, please refer to Section 44 of <br /> the Zoning Code). Contact the Planning Department for infortnetion regarding �ppeals <br /> processes for the requirements listed in this documenk ( <br /> 1. A Public Works Pertnit is required for this project. Detailed drawings in � <br /> accordance with Ciry Design and Construdion Standards shall be submitted to j <br /> the Public Worlcs Department, showing site parking layout, landscapi�g, utiliti�s, ' <br /> storm dreinape, temporary. consWction erosion conVol, and all required <br /> improvements In tha public n�ht-of�vay. Public UVorks Department approval of <br /> these draMnngs is required pnor to er�y pertnits being issued. All improvements <br /> shell be completed and approved warranted before the Occupancy Permit is i <br /> iss«ed/final approval is granted. � <br /> 2. Full standard half street improvements are required to Highway Place, including <br /> but not limited to curb, gutter, sidewalks, street widening end drainage control <br /> per City Desfgn Standards. <br /> 3. Parking m�st be per City Zoning Code and City Design and Construction <br /> Standards for Development. For a 5,920 square foot retail building, a minimum <br /> of 20 pa�lcing stalls are reqwred. A min�mum of one handicap space must be <br /> provided. <br /> 4. A f " easement for sidewalk and utilities must be dedicated to the Ciry for <br /> wid. f Evergreen Way. <br /> 5. My qradin�ll on this site shall be done so as to not impact the surrounding <br /> properties. <br /> 6. This project must comply with the cuRent City of Everett Building Code and <br /> Sprinkler Ordinance. <br /> 7. Spec�al charges for connection to the sewer and water systems in ecxordanc�� <br /> with Ordinance 1998-94 and subsequent revision are ap licable. A credit wili b� <br /> given for the existing building toward these connection �arges. <br /> 8. Provide waikway irom building to public sidewslk. <br /> 9. � City streets and alie�s are to be kept clear of dirt and debris at all times during <br /> construction. Dust suppression and sVeet cleaning must occur as directed by <br /> the Public Works Inspector. <br /> 10. A one year warranty is required on the public improvement for an amount a�ot <br /> less than 1096 of the cost of construdion and shall run for one year from the date <br /> of final approvalfissuance of the first Oaxipancy Permit. <br />