My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5830 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
5830
>
5830 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 9:34:53 PM
Creation date
2/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- . Public Works Department <br /> COST ESTIMATE SHEET ' Utilities Division <br /> 3200 Ced•ar Street <br /> Everett,Washington 98201 <br /> (206)259-8800 <br /> Receipt # <br /> Date Paid <br /> Cost of Work Order Work Order m <br /> ✓ Cost of Service Order C/��G� Service Order� <br /> Cor,ta:i Person Telephone # <br /> Requested By �j�K �� �i S' Date of Re uest <br /> q /v-7-9 <br /> Property Owner(name) �f��sj,U� ��� � ���G� . <br /> Charge Cost to(name if different than owner) <br /> Address C��, — <br /> Zip <br /> Installation Location �/`-fpp ��,� �— <br /> ����2��� <br /> Installation type/description/size/etc. ���C �j,.�r,a fZ,",yjg�� ����GL ZS �� �" ,/�1 <br /> il�E SET d�I-uGT.�iL L�'L,�' /���d/�c /'ii .4 <br /> F� r' �'�/��T/Oi�– <br /> ❑ The followmg esttmate is based upon the Utilities Division providin�all labor, equipment,materials, <br /> restoration, aud final hook-up. <br /> ❑ The following estimate is based upon the Street Division work group p�oviding all labor,equipment, <br /> materials and restoration to property. <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rentai and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and !he owner <br /> thereof,and provided further,that any excess payment shall be returned to tl�e person applying for the installation. <br /> Itemized Cost Estimate: <br /> • cc: Bldg. Permit Center <br /> Labor&Benefits ,3����U Clair Olivers <br /> Tom Thetford <br /> Material �f/,�(> . O� Kirk Brooks <br /> Equipment Rental ���lz� a Gordon Witcher <br /> � Dan Lowell <br /> Surface Restoration Stan Mitchei( <br /> Paul McKee " <br /> Sales Tax �p�� , �� Gerry Crum <br /> TOTAL �ZZ�pQ � <br /> �/ U�. <br /> �` l�t�Ll�2G-S z�ri.rc�' LC'�� 7"lr�l � /��� 2E� Ci�=T Gti <br /> b�?�o�iT 7� �r�bLr� ,[�,��' � �ih'u�.i <br /> Prepared by: �,_��� �/�Lyt Date Est. <br /> Accepted by: Prepared: Representin�: <br /> l0-�/-26 <br /> �STIMATF ('nn FOR 6 MONTHC <br /> msrncxo:!cE��stx na»Aros� <br />
The URL can be used to link to this page
Your browser does not support the video tag.