Laserfiche WebLink
i <br /> � <br /> IHousing Hope 5hort Plat <br /> D�ainage Analysis <br /> IPage 4 . , <br /> IA catch basin on the south side of the property in Basin A will be installed to collxt tunoff from <br /> off-site areas draining into Basin A. 'Ilie flow will then be directed to the storm dreinage system in <br /> Basin A through an 8-inch pipe. <br /> Lot 4, located in Basin B, includes rehabilitation of the euisting building into a commercial facility <br /> �_ for use as offices; conswction of a commercial building for rontel aparunent�rnits,daycare centa <br /> and offices; paving for a parking lot and access driveway; landscaping aroun3 buildings; and <br /> �_ conswction of a children's playground and improverunts to foofpefhs. Foodng drnins and roo€ ' <br /> downspouts will collect runoff and drain to catch basins. Runoff from the exposed portions of the <br /> (_ parking lot will drain as sheet Flow to a Type II Catch Basin for grit removal. Runoff from the <br /> exposed delivery access driveway x�ill be directed to a Type I Catch Basin for grit�emoval. The <br /> Idrainage in the catch basins will then be directed to a 15 foo;by 50 foot open widerground <br /> reinforced concnete detention vault located on die north side of Lot 3. One foot of dead water <br /> I storage above 1 S" of soil will be included in die wet vault to allow for sediment remaval and water <br /> treatment. <br /> lOutflow from both detention systems will be coi�trolled in restrictor menholes to match the existing <br /> 10-year and 100-year stonn events and 1/2 of the 2-year stoRn event. Outflow will then be routed <br /> Ito Pigeon Creek as channel flow in underground cuiverts. <br /> Two foot b:idges spanning between 18 and 20 feet are also proposed for consuuction over Pigeon <br /> Creek. These four-foot wide bridges will have a minimum of at least one foot clearance from the <br /> � high water mark in the creek (see calculations in Appendix). <br /> � Phasing Sequence for Constructic�n <br /> 71ie proposed pinject will be constructed in phases. <br /> � , <br /> , M1 The first phase,expected to begin in the Fall of 1996, will include installation of individual sto�m <br /> f drainage outfalls for both sub-basins. The two pipes (located on the west side of the property) to <br /> � be consnvcted will be put in place prirr to consuvction of the wet vaults. <br /> I <br /> I <br /> . I <br />