Laserfiche WebLink
� � <br /> Item 13: Suspended CefBo` seiweic bneing <br /> A suspended ceiling sa�nic braang detaii has'xcn r�dded to Sheet A9.3 <br /> Item 14: Update 3truc.ural Notes to 14l4 <br /> The Swctural ndes have bcen updated co 1994 per auached Pai Lin Engincering mwno of <br /> 10131/96. <br /> Item I5: Specid Inspection <br /> The Owner will contract with a recogni�ed spxial inspection firtn to provide inspac6on for <br /> concrete,rebat,masanry,and ooncuete embedmenls prior to oommencement of ccbnnstruction. <br /> Item 16: Shear Ndtlng 3chedule <br /> Per Pai Lin Fngineeting memo of 10/31/96 attached,a shear wall nailing schedule and section has <br /> been added to sheet S-4. <br /> Additional lesue: Revised Duplex Unit ConOguration <br /> We are submitting fa your review and comments and approval,dtawings illustra6ng changes to <br /> each of the R-2 zone Duplex wtits 1,2,and 3. The changes eliminate the underbuilding petldng <br /> resulting from approval by the Planning Depaz'tment for reducdon in paddng to two stalla per unit <br /> (four per swcwre). The swctures are lowered with a crawlspace below the two occupied floots. <br /> FJ►trances have been relocated with minor�e-configuration oF the bath and kitchens as a result <br /> Parking remains immediately norih of ihe structure. We are submiuing revised iloor plans A4.11, <br /> A4.12, and A4.13,Section Sheet A5.8 and Elevation Sheet A6.3 for yow review. <br /> Thank you Cor your consideration. <br /> By: Ftank G. Stickney <br /> 4 <br />