Laserfiche WebLink
, ( , � . <br /> . � , <br /> . District, then the proponen[ is required to instail fuli standard (hal� street <br /> improvements to Evergreen Way, mcluding but not limited to curb gutter, <br /> sidewaiks, street widening and drainage r,ontrol per City standards. <br /> � : 4. The un-used driveway on Evergreen Way must be removed and replaced with full <br /> !�� <br /> height curb, gutter and sidewalk per Ciry Standards. <br /> 'W� 5. On-site detention of stormwater is required ptr City standards prior to fina( <br /> approval. <br /> 6. Treatment of stormwater runoEF from the paved areas must occur, per Cicy <br /> standards, prior to the discharge of stormwater from the site or to a stream or <br /> • wedand. �_ _, <br /> ' 7. If greater than 10,000 square feet of paved surface will be created by this proje� <br /> water qualiry enhancement of storniwater runoff fro`the paved are�5 must occu <br /> prior to disdiargaref the�+stwmwatl�frorti"t'A! site o4"'to a sTfea�i or"weilan� <br /> Stormwat2r deten[ion/retention, quality protection, and enhancement requirements <br /> for this aroject shall be �hose requiremencs in effect at the cime of appiication for <br /> Public Works permits. TF-ee options for stormwater quali[y enhancement are <br /> ��"'� presented in the current cicy standarcis. The least preferred option is allowed only if <br /> . the first two options are infeasible in the opinion of the Public Works Deparcment. <br /> � The options for stormwater quality enhancement are, in order of preference: <br /> '+ .� a) An infiltration basin designe� and constructed according to ciry standards. <br /> �:� <br /> , ; b) A �.a•etpond designed and constructed to city standards. <br /> � c) A ba(�le-type oiUwater separaror followed by a vegetated swale, bo[h <br /> designed and cons[ructed according to city standards. <br /> . ' 8• All water quality enhancing facilitir,s must be designed ir. accordance with city <br /> standards, and shouf� be sized [o meet the requiremencs of all future expansion on <br /> �;� the site. <br /> . 9• Per city standards, surface drair,age facilities including wetponds, detention facilities, <br /> vegetated swales, and infiltration facilities shall be located outside the associated <br /> buffers of all wetlands, streams, rivers, lakes, or ponds. Wetlands may not be used <br /> for detention of stormwater. <br /> _ 1 "_� <br /> 10. The wetpond and detention must be designed and installed prior to final approval. <br /> ese features must be on lot 4. <br /> ;�" 11. The sewer and water systems for lots I, 2, and 3 must be insta��ed prior to final <br /> approval. <br /> ��� ' 12. The buffer reduction is approved as shown on the short plat map and btiffer <br /> enhancement plan. 'fhe stream and buffer planting plan must be cort�pleted prior to <br /> final approval of the short piat or an assurance de�ice (perfortnance bond or <br /> _ assignenent of funds) worth �00% of remaining improvements must be sub��itted to <br /> � the Planning Department. <br /> . � <br />