My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5830 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
5830
>
5830 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 9:34:53 PM
Creation date
2/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
5830
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/1i}�L_'�'g,��`''��s Public Works Department <br /> L•��� // � � Utilities Division <br /> ���(i �T a- ,� '�'�"� 3200 Cedar Street <br /> COST ESTIIMATE SHEET Everett,Washingtoo 98201 <br /> � ��\n(��/� (206)259-8800 <br /> I � � <br /> Date Paid <br /> Receipt # <br /> Cost of Work Order Work Order # <br /> X Cost of Service Order 10,124.00 Service Order# <br /> Contact Person 'felephone # <br /> Requested By Kirk Brooks Date ofRequest LO-7-96 <br /> Property Owner(name) Housing Hope Village — <br /> Charge Cost to(name if different than owner) <br /> Address City Zip <br /> Installation Location 5700 Blk Evergreen <br /> Installation rype/description/size/etc. Espose&tap 12"main, insta1125' (�) 3"D[ pipe, set vault&meter, restore <br /> area. Final connection. <br /> � The following estimate is based upon the Utilities Division providing all labor,equipment, materials, <br /> restoration,and final hook-up. u ment, <br /> � The following estimate is based upon the Street Division work�roup providing all labor,eq ip <br /> materials and restoration to property. <br /> Please notifv t6e Citv of Everett UtiliNes Division 10 workine davs in ad-+ance of reauired installation date tu <br /> allow for scheduline and parts orocurement <br /> Whenever the estimated cost is not suftic�ent to cover the total expense for labo�, material, equipment rental and <br /> administrative costs, the deficit shall be charged to the pronert}• for which such installation was made and t6e owner <br /> thereof,and provided Nrther,t6at any excess payment shall be returned to the persan applying for the installatian. <br /> Itemized Cost Estimate: <br /> cc: Bldg.Permit Center <br /> Clair Olivea <br /> Labor& Benefits 3,?40.00 Tom Thetford <br /> 4,961.00 Kirk Brooks <br /> Material Gordon Witcher <br /> Equipment Rental 1,182.00 Dan Lowell <br /> Stan Mitchell <br /> Surface Restoration — Paul McKee <br /> Sales Tax <br /> 741.00 Gerrj•Crum <br /> TOTAL _ 510,124.00 * <br /> ' 6 weeks leadzime necessary for orderin:;meter atter receipt of deposit. <br /> / / <br /> � Date Est. <br /> Prepared by: Gerry Crum /(�— <br /> Accepted by: Preoared: Representing: <br /> l0-ii-96 <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> COSTAGNU GC06u4L?I lo�l 1i961 <br />
The URL can be used to link to this page
Your browser does not support the video tag.