Laserfiche WebLink
t <br /> Subsurfnce Erp/oratton, Geolagic Ha:ard, and <br /> � Noruing llope PJust!/ Prrlimi�wr� Gtotahnica!Engineering Rcpart <br /> F.rrrrtt. Rasi:iagron Yroj�ct anJ Site Conditions <br /> � The following section pre�ents more detailed subsurface infonnation organized from the u��er <br /> (shalluwestl to the lower (derpest) soil tyges. <br /> � d.l $tI3l�lf�ph�' <br /> f'�tll <br /> � �tan-placed fill consisting of loose, moist, gray silry sand widi gravel, trash and woody debris <br /> � was identifirci in EP-3, EP-I, EP-6, and EP-7. A relict topsoil horizo❑ was occasionally <br /> present beneath the fill. The fill/relict topsoil extended to a maximum depth of 4 feet in EP-3. <br /> The fill was likely derived from grading of the residential por�ion of the lot to the west of die <br /> proposed building sit�. The stecp, 2H:IV (HorizontaL•Verticall slopes along the w�est site <br /> � boundary are [ikely composed of fill �ni! that w:u pushed over the embankment duriug <br /> construction of the building pads for the exis[ing strucmres. Abundant cons�*uction debris and <br /> � trash wa�s observeci �aithin the shallow s;irficial soils comprising chese slopes. <br /> Recessrona! Ourn�ash <br /> ( Loose eradin� to mr,ciium dense, red-brown to gray sand with varying silt content and some <br /> gravel was eocountered in all ezploration pi[s to depths ranging &om I.5 feet ia EP-1 to <br /> � greater than 16 fee[ in EP-3. In general, these sediments were loose oxidized, silty, and <br /> contained roots to a maximum depth of 7 feet in EP-3 grading to medium dense, gray, clean to <br /> f slightly silty with depth. At an approsimate depth of 13 to 14 feet in thc vicinity of EP-2 and <br /> EP-3, [hese sedime�cs became very moist and interbedded with dense silty fine sand. In EP-2, <br /> ' this denser ma[erial was interprcted as till. The medium dense outwash is suitable for shallow <br /> I spread footing foundations and pavement support, provided our recommendations are <br /> followed. Infiltracion may also be feasible withio this sediment ptovided fl�ere is enough site <br /> area and sufficient permeable soil depth to constn;ct appropriate infr;dration facilities. Once a <br /> 1 target infiltration design concept and area have been established by the design team, we can <br /> . further evalua[e soil contiitions as necessary. <br /> ( Till <br /> � <br /> Giacial soils beneath the outwash are interpreted as Vashon till. The till generally consists of <br /> I dense to very dense, moist to wet, silty sand with gravel and cobbles. Several thousand ieet of <br /> ice consolidated these sediments approximately 14,000 years ago during the last southward <br /> � glacial advance into the Puget Sound. This process resulted in a compact soil possessing high <br /> strength, low compressibil�.ry, and low permeability charactcristics. Till was encountered at <br /> depths ranging from 1.5 to 13 feet beneath the property. [n general, till was encountered at <br /> � shallow depths on the east half and south end of the property and below approximately 13 to 14 <br /> feet in the nor[hwest corner of the site. The dense to vzry dense till is also suitable for <br /> foundation support, but is not suitable for infiltration. <br /> IFebrtrary !1, 2002 ASSOClATED F14RTf1 SClENCES, INC. <br /> S.7L-N�K£01 if7A:�P�prn'�.:UJI if9�REIWP�µ^.X Page 4 � <br /> r S/ <br /> � 73 <br />