Laserfiche WebLink
ISubsurfacr Erp(orarian. Geologlc Hr,ard, and <br /> � Nouring Nopr Pluut!! Preliminary Geotcchnical Engineering Re�ort <br /> E�•rrrn. {ti¢shing:on Dttign Rtconvntndationt <br /> � <br /> I 3II. DESIGN REC01�L1LE!�iDATIONS <br /> � <br /> � s.o ixTRonucrion� <br /> Our cxpiora[ion indicates that from a geotechnical standpoint, the pazcel is suitable for t�e <br /> � yroposed devalopment provided the risks discussed are accepted and the recommendations � <br /> contai�ed herein are p:operly followed. The braring stracum of inedium dense rece,a,ional <br /> � ouavash or dense till is located at approximately 18 inches to 4 fect bclow existing site grades i <br /> aloag the eastern portion of the site and cear the nardiwest property corner (EP-2). Tlie depth I <br /> to bearing saata was encountered at depths r.anging from 5 to 7 fcet along tiie tce of die slope � <br /> � nexr the southwest corner of the proposed building area (EY-3 and F.P-4). The st�ecific depth I <br /> to bearing strata in each exploration is identifiec! in brackets on Figure 2. Conventional spread I <br /> footing foundations that bear on the medium dense ounvash or dense [ill may be used for <br /> � buitding, retaiiun¢ wall, and pavement subgrade support. , <br /> � 9.0 SITE PREP�IRATION <br /> Site prepazation of planned construction areas should include removal of all trees, brush, <br /> � debris, and any otl�er deleterious material. Additiunally, the upper organic topsoil and ar,y <br /> loose fill or recessional outwash soils should be removed and any remaining roots grubbed. <br /> I Areas where loose surficial soils exist due to grubbing operations should be co�sidered as fill <br /> to the dep[h of dismrbance and treated as subsequently recommended for swctural fill <br /> placemcn[. <br /> ! <br /> ISince the density and moisture content of the soil at the site are slighdy variable, random loose <br /> or silry w�et pockets may exist, and the depth and extent of stripping can thcrefore be best <br /> � determined in the field by the geo[ectuiical engineer. Stripping depths are expected to be on <br /> the order of 12 to 36 inches. <br /> 1 We recommend proof-rolling building, driveway, and parking areas with a loaded tandem-axle <br /> dump truck to identify any soft spo�s. Soft areas should be overexcavated and backfilled with <br /> swctural fill. If construction is to proceed during wet weather, and Uie exposed subgrade <br /> � consists of till, we recommend systematic probing in place of proof-ro(ling to identify soft <br /> areas. <br /> IIn our opinion, stable construction slopes should be the responsibility of the contractor and <br /> should 6e detcrmined during construction. For estimating purposes, however, we anticipate <br /> I that tempor.�ry, unsupported cut slopes in the loose to medium dense fill and glacial outwash <br /> soils can be made at a maximum slope of 1.SH:1V. Temporary cut slopes in the dense <br /> outwash and till sedimenu can be exravated at a maximum slope of 1H:1V. As is rypical with <br /> IPebruary I!, 2002 ASSOCIA7ElJ E1RTH SClENCE$ 1NC. <br /> SGl1'S!�KE0I7Nd:-Pm�ret�10917N�KE70.P.W� Page 9 ^ <br /> � �o� <br /> ► <br />