Laserfiche WebLink
„ <br /> _ •�y <br /> � <br /> : <br /> , � . � --, � <br /> , E <br /> City of Everett <br /> � Improvement Plan Checklist <br /> � �.4 �'G� P Fi—�=� '�a ic�a� <br /> C.heckl�st Prepared By Date --+ <br /> . � <br /> i <br /> � <br /> Stre�t and/or Storm Drain Improvements (1) <br /> � <br /> � Pla: or Project�77i �,� r.��,p � � , <br /> �..�.�r,r—tii,a� s�i -�v <br /> � � North Arrow <br /> � s� Scale indicated (vertical and horizontal) <br /> � l"=40' horizontal and f"=5' vertical, minimum <br /> id Names on all streets, centerline shown <br /> _ � Indicate Right-of-Way and Improvement Widths <br /> I ✓ Indicate existing improvements with dashed lines <br /> � �__. Show new improvements to be corstructed with solid lines <br /> %✓ lndicate af! existing pipe lines, utilities, power poles, etc. <br /> address ail conflict points and indicate their disposition and by whom <br /> � <br /> � �_ Show centerline stationing (siationing is to run left to right) <br /> � _�/�_ indicate stationing for al1 beginning of curb returns (BCR's) <br /> and ends of curb returns (ECR's) and BC's and EC's oE all <br /> ` centerline curves. <br /> ( _�! [ndicate curve data on plans for centerline curves and curb returns <br /> � (Delta, Tangent, Radius, Length) <br /> E .i._ Ind'i-;ate stationing ai beginning and end of improvement work. <br /> � <br /> .—/]!_� Indicate Top Curb (TC) elevations at all BCR's and ECR's and at <br /> � _ ends of existing curb and gutter that is being joined or matched <br /> with new improvements. <br /> ✓ Pavement flares to transition from e�cisting E.P, to new improvements <br /> � are to be shown at 2:l incoming and 5:1 outgoing. <br /> �_ Asphalt concrete transition ramps are to be shown at ends of new <br /> � sidewalk sections where sidewalk does r,ot exist. <br /> ✓ Indicate drainage patterns at both ends of ne�.v improvements and <br /> � work needed to insure existing drainage is not blocked. <br /> ...� <br /> �� <br /> . . J <br /> , <br /> � <br />