Laserfiche WebLink
_ � <br /> � <br /> � <br /> r '"� <br /> _ i'��:C:lI , c.�c i'-�.:.:,�:�l.:iC.`'{'= : �_„� <br /> . r.ii G ... <br /> COtJSULTING ENGINEERS <br /> 197a5 S.E. 8[h St., Redmond, Washington 98052, (200) 881-9�53 <br /> F1ELD INSPECTION REPORT SIZZLER F!�MiLY STEAK I10USE July 25, 1983 <br /> DATE: July 18, 1983 <br /> LOCATION: Everett, WA <br /> INSPECTION: y0� <br /> ELECTRICAL <br /> 1. At the time of the inspection, a large n.m�her of al�plianc�, recep:acles, <br /> and switches had not been installed and the branch wiring and bonding was <br /> not corpl ete. ' <br /> D <br /> o' 2. Verify riith the Utility Cor{�any the size of the transformer, the available <br /> � l shv�t-circuit current at theservice entrance h;uipment and ��eri`y to the <br /> � � � , �F�chitect in writino that the service and distribution eauipnent has <br /> P���L'� N,� short-circuit ratings equal to or excee;ling the maxir,um short circuit <br /> �,�i ��c <br /> 6 current available.� <br /> � 3. For all three reof-top heat pump units, the bra�ch circuit fec�ers for the <br /> � �l !1ed': sr!�r5 L3�`��::!. ,'.: C�c `v: Si�c "v` L.`�c �J:�}:�r'l'.50� �iaCl4;ilEtl tii L= $�i2E47 <br /> V,'ii� t�o snzll , unfuse:l, and are not de-energi¢ed by the disconnect. Th�ry should <br /> `��N�' �.1 . �t be tVo. 3 CU, protxtcd by a fusible disconnect that contains 80 Ary� fuses. <br /> I �d � �1 �� For safety rezsons they nust be re�oved or config�red as s:�tKi above <br /> ���f 11 in:nediately. . <br /> � ' . <br /> ✓ 4. The fee�ers inside the roof top com�re�sor disconnect enclosure sha�ld be <br /> � �outed so as not to rub the switch bar. <br /> � 5. Lenduit routing around roof top corr�ressors should besecured in place. <br /> �;I` <br /> �u ,�qn. Emergency pathwa}� li �iting is net �nstalleci per dra�.•ir,g, 1'erify ce��liance <br /> ' �/]�° �.ith the Bu� }ding Department and the Fire hiarshall and submit a letter of <br /> acceptability. <br /> l/!l. Liqhting fixtures, Type "E", installe;i in the kitchen areas are rrot sealed <br /> and gas�:etcd. <br /> (/8. The wall wash fixture o��er the nenu was missing and a junction box in the <br /> ceiling could not be located for same. <br /> �/9. Paddle fans require speed controls per plans. <br /> ,�10. Toggle switches were used as disconnecis for the five corpressors in the <br /> cor�ressor room. These should be: fusible disccnnects per drawings , fused <br /> per manufacturer's re:omnendations. <br /> L <br /> Mechanicai • Electrical • Ene�SY Analysis <br /> 1 l Ml <br /> w <br />