Laserfiche WebLink
� Drainage calds <br /> ' i. PROJECT OVER VIEW. <br /> This project prcposes the constnuction of approximately <br /> 3400 Sr Building on 1.53 Ac. Lot. <br /> 2. EXISTING DItAINAGE CONTIITION. <br /> Existing surface water shef+t flow to the catch basin on north west <br /> comer of the parking lot an� from there to City drainage system. <br /> 3. PROPOSED �RAINAGE. <br /> Developed run off is conveyed to two (2) wet pond with flow control <br /> man holes and released ta existing City drainage system. <br /> 4. SLOPE OF ENGINEERING ANALYSIS. <br /> The analysis will be in accordance with the 7YQe 24 <br /> City of Everelt Drainage Ordinanc� <br /> Design is baseci on 6 month , 2� HR Design Storm to determine <br /> the storage volume far new pond, using SBiJH/SCS method. <br />