Laserfiche WebLink
EVERGREEN WAY RETAIL CENTER <br />COST ESTIMATE FOR SITE WORK <br />AsphaLt Paving 23,500 :�F @ 65¢/SF <br />6 FT High Rockery 150 LF @$27/LF <br />Side Sewers - 2 Buildings 135 LF @$25 <br />2 Sewer Cannections @ $600 ea. <br />Storm Dra.inage System <br />TOTAL PROJECTED COST FOR SITE WORK <br />15,275.00 <br />4,050.00 <br />3,375.00 <br />1,200.00 <br />4,200.00 <br />$28 100.00 <br />� � r�2S <br />