Laserfiche WebLink
Mr. Tim Tyler � <br />November 5, 1990 <br />Page 2 <br />r—� <br />Thc project is currendy out to bid. Once a Contractor has been selected, the Conr.actor's <br />name, address, phone number and business license number will be provided. <br />The following information is provided as requested in section I of the attached "Ciry of <br />Everett Building and Public Works Petmit Application b'finimum Requirements Chxklist": <br />A. Ocwpancy Group - The pump station saucture is class�ed as occupancy group <br />B-4. <br />� B. Type of Consttuction - Type II-N <br />C. Area of Site - The overall azea of the site is approximately 13.98 acres. The <br />Alderwood Purnp Station No. 2 wil� be located near the northeast corner of this site <br />in an area of approximately 100 feet by 160 feet (0.37 acre). The actual size, <br />dia�ensions, and area co be leased fa the s�te is c�rrendy being negotiated. <br />D. Area of Building - 1991 sf. <br />�. Occupancy I.oad - Occupancy load is 7 based on a Mechanical Equipment Room <br />use classification. <br />F. Number of Off-Smeet Parking Spac�s - Two <br />The Alderwood Water District needs to have this project constructed and on-line by June <br />15, 1991 in oider to avert water shortages from anticipated water demands due to growth in <br />their service area, tn orcler to meet the construcdon schedale we need to grant a nouce-to- <br />proceed to the Contractor as soon as possible in early December. Therefore, we would <br />appreciate your efficient review of this application. If you have any quesdons or concerns <br />regarding this application, please contact Greg Harris, at 881-1100. <br />Very truly yours, <br />James M. Montgomery, <br />Consulting Engineer, Ine. <br />,9�,��.ar.��.�' %%n.7�.a�_. <br />Gregbry §. Harris, <br />Projoct Engineer <br />GSH/bls <br />M1875009 <br />