My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6003 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
6003
>
6003 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 4:28:43 PM
Creation date
2/9/2017 10:05:56 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6003
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tim Tyler � <br />November 5, 1990 <br />Page 2 <br />r—� <br />Thc project is currendy out to bid. Once a Contractor has been selected, the Conr.actor's <br />name, address, phone number and business license number will be provided. <br />The following information is provided as requested in section I of the attached "Ciry of <br />Everett Building and Public Works Petmit Application b'finimum Requirements Chxklist": <br />A. Ocwpancy Group - The pump station saucture is class�ed as occupancy group <br />B-4. <br />� B. Type of Consttuction - Type II-N <br />C. Area of Site - The overall azea of the site is approximately 13.98 acres. The <br />Alderwood Purnp Station No. 2 wil� be located near the northeast corner of this site <br />in an area of approximately 100 feet by 160 feet (0.37 acre). The actual size, <br />dia�ensions, and area co be leased fa the s�te is c�rrendy being negotiated. <br />D. Area of Building - 1991 sf. <br />�. Occupancy I.oad - Occupancy load is 7 based on a Mechanical Equipment Room <br />use classification. <br />F. Number of Off-Smeet Parking Spac�s - Two <br />The Alderwood Water District needs to have this project constructed and on-line by June <br />15, 1991 in oider to avert water shortages from anticipated water demands due to growth in <br />their service area, tn orcler to meet the construcdon schedale we need to grant a nouce-to- <br />proceed to the Contractor as soon as possible in early December. Therefore, we would <br />appreciate your efficient review of this application. If you have any quesdons or concerns <br />regarding this application, please contact Greg Harris, at 881-1100. <br />Very truly yours, <br />James M. Montgomery, <br />Consulting Engineer, Ine. <br />,9�,��.ar.��.�' %%n.7�.a�_. <br />Gregbry §. Harris, <br />Projoct Engineer <br />GSH/bls <br />M1875009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.