My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6003 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
6003
>
6003 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 4:28:43 PM
Creation date
2/9/2017 10:05:56 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6003
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T0: <br />FROM: <br />DATE: <br />SUB.TECT: <br />M E N 0 B A K D U M <br />JIM DRISCOLL, F?'r.'ARING �AMINER <br />PLAtfNING & PUaLYC WORKS DEPARTMENTS <br />NOVEMB�R 29, 1990 <br />SPU PERMIT 1113-90, ALDERWOOD P[Jt� STATION <br />� . " <br />, <br />'; � <br />; � ; <br />`. " NOV 3 0 1990 �' '` <br />CITY OF EVERETT <br />Public Works Dept. <br />In response to the iasue regarding the applicant's compliance wlth condition <br />1!I1 as contained in the Staff Report to the Hearing Ezamiaer, a�ioise test wae <br />conducted by the City's Safety Inapector at the proposed aite for the <br />Alderwood Pump Station 112. A dosimeter (Quest M28 (IGR7030005) was used to <br />measure the noiae levels, which were being generated by the eaisting pump <br />stationa and the traffic on �ergreen Way. <br />On November 24, 1990, a noiae test was conducted at the proposed project site <br />from 10:48 a.m. to 12:15 p.m. The LEQ* (Equivalent Sound Level) was <br />58.6 db's. On November 26, 1990, a second test was conducted at the proposed <br />project site from 5:17 a.m. to 6:32 a.m. The LEQ was 42.6 db's. <br />According to the City's Safety Manager, the test results indicted that the <br />noise levels being generated by the egisting pump stations fell within an <br />acceptable range when there were low trafEic volumes on Evergreen Way. As <br />traffic volumea increased on �ergreen Way, the noise levels slightly exceeded <br />the acceptable range per the City's Noise Ordinance 1/534-78, as amended. <br />On the basis of the reaults of the noise teat and the following measures as <br />proposed by the applicant, staff is deletiag condition 1/11 from the Staff <br />Report, and the I�IDNS (SEPA 1/96-90) as a condition of approval of the Alderwood <br />Pump Station 1i2. <br />1. Setbacks - The proposed pimp station will be located just weat of the <br />existing pump station and will be approaimately 132 feet south of the <br />property liae, which is common to the Clark Development Project. <br />2. Landacaping - The proposed landscaping for the Alderwood Pump Station, <br />especially along the north property line, should serve as a noise <br />buffer, thus reducing the noise impacts on the Clark Development <br />Project. <br />3. Noise Mitigation - In order ta control long-term noise impacts, <br />equipment will be housed in a sound absorbing concrete block building <br />structure. Air intake openings will be on the weat side of the pump <br />atation with a eound trap structure and will eahauet through the roaf. <br />There should be little, if any, increased noise at the site as compared <br />to eziating noiae levels, becauae wh11e the new pump station ia <br />operating, the ezisting p�p station wil_ generally not be operating. <br />As a matter of record to the Hearing Ezaminer, with regard to the request by <br />the "Stream-K�epere" group for conetruction of 150 feet of open channel for <br />Pigeon Creek lil, the Public Works Department hae the following comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.