Laserfiche WebLink
�� s7G � �� <br />���� //�� �� <br />� o� �l'� <br />C <br />MEMORANDUM <br />TO: Larry Crawfo� <br />FROM: Da:� Mathias <br />DATE: December 26, 1990 <br />SUBJECT: Alderwood Pump Station <br />�, <br />�`.,�.. <br />.�::<���°,' <br />, �� <br />, , , <br />'fhe construction plans for the Alderwood Pump Station on Evergreen Way appear <br />ready for approval. However, there are some operational issues that need to be <br />resolved between ttie District and the City. <br />To allow the Distr;ct to proceed with construction and yet ensure that the <br />operational issue is re:solved, �lease add a condition to the face of the permit that <br />the certificate of occupancy will not be issued until a written operational agreement <br />is executed between the City and the District. <br />Thanks <br />cc: Clair Olivers <br />Dan L.owell <br />Tom Thetford <br />Loren Postma <br />PLJBIIC WORKS DLPAR�I'MTT(4' <br />3200 Cedar Street, Everett, Washinglon 98201 (206) 259-5819 �AX (206) 259-8881 <br />