Laserfiche WebLink
e�1 �OSTING I'� ° "�' <br />� CLOSED QI F1URK �RD� R��RT <br />Total Utili.ty Maintenance Manageu�ent System paqe 1 <br />08/05/1996 <br />Date Range :O1/09/1989 - 08/05/1995 <br />CM Work Order Range :7.001091070001 - uT1002-- - pattern :*101196649005 <br />Item Range :<Blank> - F1�22�20001 <br />Program ALL Function ALL Ac;tivity ALL_________ _________�____ __________ <br />CM WORK ORDER ID: 7101196649005 Title: SO 2 INCH 6100 EVERGREEN WA'St (B) <br />Item ID: -- <br />Location ID: -- Activity 664 <br />Program 710 Function 119 <br />Date Completed: 07/11/1996 <br />Overall Craft: <br />Issued: 07/O1/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID____ <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />I�Iaterials: <br />ID <br />BOX000043547 <br />BOX000045147 <br />CORP38002547 <br />COUP38007347 <br />ELL038106447 <br />ELL038107947 <br />METE38137747 <br />NIPP38134347 <br />pIPE38060947 <br />SADD50019147 <br />SETT38033447 <br />VALV38034348 <br />Vehicles: <br />ID <br />V2117 <br />VIi0003 <br />Name <br />Issued by: Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />SMITH, STEVE J. <br />THOMPSON, DWAYNE E. <br />WALDEN, DAROLD T. <br />Description <br />Planned Hrs Actual Hrs <br />------- <br />0.00 <br />6.00 <br />0.00 6.00 <br />0.00 6.00 <br />Total Labor Cost: <br />BOX VALVE 18" CI TOP&LID ONLY <br />BOX METER CONC W/STEEL LID <br />CORP STOP 2" MIP X MIP @ <br />COUPLING COMP 2° MIP X CTS @ <br />ELL 2" 90 DEG BRASS <br />gI,I, z�� 90 DEG STREET BRASS ^ <br />METER 2" NEPTUNE W/PRO READ ^ <br />NIPPLE 2" X 6" BRASS <br />PIPE 2° POLY C.T.S. Z„ IP DBL <br />SERVICE SADDLE 12 W/ <br />SETTER CUST 2" LENGTH 12"X 17° <br />VALVE GATE 2" SUPER HEAVY DUTY <br />Description <br />91 CHEV 1-TON HYD UNIT <br />94 CAT BACKHOE <br />Date <br />07/11/1996 <br />07/11/1996 <br />07/11/1996 <br />07j11/1996 <br />07/11/1996 <br />07/11/1996 <br />07/il/1996 <br />07/11/1996 <br />07/11/1996 <br />07/11/1996 <br />07/11/1996 <br />07/11/1996 <br />;y Used <br />---- 1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Hours <br />6.00 <br />6.00 <br />Total Vehicle Cost <br />Cost <br />33.60 <br />167.40 <br />201.00 <br />Cost <br />89.46 <br />103.44 <br />119.52 <br />312.42 <br />Cost <br />-----16.88 <br />130.61 <br />54.29 <br />36.00 <br />8.34 <br />9.87 <br />429.32 <br />7.26 <br />1.04 <br />36.45 <br />277.94 <br />_ _9__52 <br />1093.5 <br />