Laserfiche WebLink
----- 2���� <br />1 b�t ,Q � <br />X�� <br />" UTILITY WORK ORDER <br />Date: .���s— �WATER <br />, ❑ SEWER <br />❑ STORM <br />t <br />1 <br />i <br />Location: ��G✓ �\��� <br />W.O. Instructions: <br />ESTIMATED <br />Labor(hours) <br />Material (cost) <br />Equipment (cost) <br />; `'�/>>�� . <br />CITY OF EVERETT � <br />.� <br />UTtLITIES DIVISION � �/ C� � �. <br />r W.O. No. _�' <br />f,, �,� —7 <br />�. ' � � � Acct No. ,� � A s � � 9 <br />s � <br />� . Complaint No. <br />❑ SERVICE <br />❑ MAIN <br />❑ PUMP STATION <br />❑ TREATMENT <br />❑ RESERVOIR <br />❑ VALVE <br />❑ MAN HOLE <br />❑ CATCH BASIN <br />❑ DITCH <br />/c'c /�7 <br />❑ MAINTENANCE <br />O OPERATION <br />❑ REPAIR <br />❑ CONSTRUCTION <br />r � <br />ACTUAL <br />Labor (hours) . <br />Materiel (cost) . <br />I Equipment (cost) : <br />SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR 1'IME SLIPS. ITE""�Z� <br />LABOR, EQUIPMENT, AND MATEFIALS ON REVERSE SIDE. <br />Completion(Date): �� ���r'� � CostS <br />Charge Account Number: <br />Address: <br />Charge Cost To (Name): <br />�c, <br />Invoice No.: Amount:� _Date: <br />1/BS <br />