Laserfiche WebLink
2001 <br />NanresiCenliol <br />Code Comoi�^nce Farm <br />�Project Description I L� New Building [] Addition ❑ Alteretion ❑ Change of Use � <br />Q Prescriplive � Component Pertormance ❑ ENVSTD 2.1 � Systems <br />Compliance Option (See Decision Flowchart (over) for qualifications) (4.0 nol acceptable) Analysis <br />Semf•heatedspace� <br />Minimum Insulation R-values <br />Roofs Over Semi-Healea Spaces2 <br />7. Assemblies with metal framing must comply with overall U•faclors <br />2. Refer to Section 1310 for qualifcations and requiremenls <br />Notes: <br />Opaque ConcrelelMasonry Wall Requirements <br />Insulation on interior- maximum U-faclor is 0.19 <br />Insulation on exlerior or inlegrat - mazimum U-factor is 0.25 <br />If project qualifies for ConcretelMasonry Option, list walls <br />wilh HC ? 9.0 Btu/ft �°F below (other walls must meet <br />Opaque Wall requirements). Use descriptions and values <br />from Table 20-5b in the Ccde. <br />Wall Description U•factor <br />(including insulation R-value 8 position) <br />a9n REGI:;irI7ED <br />� ;i}7f:l�i i (CT <br />CH/�IG F::?�� q;�Df.RSOPJ <br />S1A�E OF IVJ�:;NIifGfO�! <br />��3 <br />