Laserfiche WebLink
� <br />Total Utility MaintenanoewManagement System ro P�J�I�V_ ��-/-'— Z---�_ <br />10/10/1994 Page 1 <br />________________________________________________________________________________ <br />Date Range :10/01/1992 - 10/14/1994 <br />CM Work Ord2r Range :<Blank> - 8405421080229 Pattern :7401196648154 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7401196648154 Title: SO 2 INCH 6521 EVERGREEN WAY <br />Item ID: -- <br />Location ID: -- <br />Program 740 Function 119 Activity 664 <br />Date Completed: 10/06/1994 <br />Overall Craft: <br />Issued: 09/26/1994 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />WST MKC <br />UL TDE1 <br />Materials: <br />ID <br />BOX000045147 <br />CORP38002547 <br />COUP38007347 <br />ELL038106447 <br />INSE38021047 <br />METE38090547 <br />NIPP?II133847 <br />NIPP38134347 <br />SADD46018647 <br />SETT38033447 <br />VALV38034348 <br />Vehicles: <br />ID <br />V2117 <br />VH0003 <br />Issued by: SKL Assigned tu: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />---------------- <br />MOORE, KIM C. <br />THOMPSON, DWAYNE E. <br />Description <br />BOX METER CONC W/STEEL LID <br />CORP STOP 2" Id2P X MIP @ <br />COUPLING COMP 2" MIP X CTS @ <br />ELL 2" 90 DEG BRASS � <br />INSERT STIFFENERS 2" CTS @ <br />METER 2" PRECISION <br />NIPPLE 2" X CLOSE IIRASS � <br />NIPPLE 2" X 6" BRASS " <br />SERVICE SADDiE 8" W/2" IP DBL <br />SETTER CUST 2" LENG'fH 12"X 17" <br />VALVE GATE 2" SUPEIt HEAVY DUTY <br />Description <br />--------------- <br />CHEV 1 TON '91 <br />94 CASE BACHIiOE <br />Work Description: <br />Planned Hrs <br />0.00 <br />0.00 <br />Actual Hrs <br />6.00 <br />6.00 <br />Total Labor Cost: <br />Date # Used <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />10/06/1994 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Date Hours <br />10/06/1994 6.00 <br />10/06/1994 6.00 <br />Total Vehicle Cost: <br />Cost <br />118.38 <br />86.10 <br />20A.48 <br />Cost . <br />111.81 <br />51.41 <br />47.82 <br />14.08 <br />1.72 <br />169.y3 <br />2.86 <br />6.43 <br />21.40 <br />257.95 <br />77.87 <br />763.28 <br />Cost <br />34.80 <br />0.00 <br />34.80 <br />n <br />