Laserfiche WebLink
Date_Z�12�b <br />Application For <br />PUBLIC W019KS PERMIT <br />Print or Type Only <br />Mailing <br />Mailing Aooress <br />Describe Proposed Work <br />Project Address (if known) <br />Attach four (4) copies of plans for proposed work <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />Public Works Pewr <br />Bldg. Dept. <br />Public Works Fee <br />Total Fee $ <br />Less e Foe Paid $ <br />.Q-- <br />Balance <br />BalancDe Due $ <br />City <br />city <br />r <br />and note the foll44ing as applicable: <br />• Centerline of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance • phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800.424.5555. <br />S- ,��/L�ci4irJT <br />F L INSPECTI0N <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />7� <br />O <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for qqd further agr* to remove same upon notice from the <br />City and to.f lace pub Ic o er dam g d thereby. / <br />i <br />SioKature of Applicant Date <br />WORK AUTHORIZED BY THIS WIRMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />