My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7010 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7010
>
7010 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 10:46:59 AM
Creation date
2/9/2017 11:12:44 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7010
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />OTHER OR CONSULTATION: EA.&y Re V)L ,, <br />❑APPROVAL PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR T.C.O. CORRECTION REQUESTED <br />OK FOR C.O. VIOLATION <br />UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION - 24 hour notice required ❑ <br />❑ ❑ ❑ <br />❑ ❑ <br />❑ <br />Date: S-IS�Z <br />.Permit �(1GcC`d33 <br />r. <br />Contractot� <br />ni�rJ� I PC <br />� C <br />rJA A f[T <br />Owner: <br />(` <br />Site Address: <br />7 GlQ <br />�1/e� C%P !P <br />_ +� <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />El Temp Service <br />❑ LIFER ground <br />ElGroundwork/Slab <br />❑ Groundwork/Slab <br />❑Groundwork <br />❑Fooling <br />❑Rough In <br />❑Rough In <br />❑ Slab/Conduit <br />El Foundation <br />El Ceiling Grid <br />❑Ceiling Grid <br />❑ Rough In <br />❑Structural Slab <br />❑ OK to insulate <br />El OK to insulate <br />❑Service <br />❑Framing <br />❑Rooftop Units <br />❑Water Service <br />❑Grounding <br />❑Insulation <br />El Mechanical Final <br />❑Medical Gas <br />❑Ceiling Grid <br />❑Drywall Nailing <br />El Plumbing Final <br />❑Electrical Final <br />❑Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑Roof Nailing <br />El Rough In/Service <br />Hot Water Tank <br />❑ Fooling drains <br />❑Ceiling Grid <br />[I Refrigeration <br />El Rough In <br />El Roof drains <br />❑ Building Final <br />❑Gas Pipe Final <br />ElHWT Final <br />Inspector—_ Date: <br />EIR (.1/09)4+�ATu -- iuve.e r�nw�uu�. • +e+,+xaxwx� <br />
The URL can be used to link to this page
Your browser does not support the video tag.