Laserfiche WebLink
� Sunrise Services-Drninage Study <br />c 4. DCT�NTION D�SIGN CRIT�RIA <br />Detention will be provided to satisfy the 2-yrir, 10-year and 100-year storm <br />requirements per the City of Everett srorm drainage requirernents nnd the 1992 <br />DOC Stormwater management Manr.aL The Storm Drainage calculations are <br />� based upon the Santa Barbara Unit Hydrograph Method as described in thc <br />Stormwater Management Ylanual for Puget Sound published by DO� in Junc <br />1991 (ReL 1). A 42�/o sofety factor is designed into the detention siruclure to <br />protect the downstream conditions as described in the previoiis pages. <br />� Rainfall intensity is detennined according to the referenced DOE Manual :vlethod <br />using Isobaric Charts for Snohomish County. Flydrograph calculations are <br />performed on the Watenvorks Program developed by Engenious Systems, Inc. <br />The storm selected was the re�uired Type lA for Snohomish County. <br />Concentration times assumed bascd upon Ilows from the most distant point on the <br />site to the proposed discharge point. Developed concentration times were <br />� assumed to be 7.3 minutes. <br />Basin descriptions are provided on the computer reports for the design storms of <br />interest, the 2-year, 10-year and 100-year storms for undeveloped and developed <br />cases respectively. These detention criteria are the exact criteria imposed on the <br />� s;;stem approved immediately east of this sile. Storm data is presented in tabul,v <br />format on Ihe following paoes with brief summaries and explanations of thc <br />results. <br />The required Release Criteria for the dc��elopment �re as follows: <br />i[ 5�°��-Q2-year Undev;loped = O.00d cfs <br />Q 10-year Undeveloped = 0.028 cfs <br />Q100-Year Undeveloped = 0.065 cfs <br />(This assumes meadows or pasture as the irodeveloped condition) <br />�� <br />� <br />:� <br />�vesrea� enciurcus. iuc. � riaaecr:oi �o�, <br />1l <br />