Laserfiche WebLink
� Sunrise Services-Urninage Study <br />6. WATER QUALITY S/ZING <br />� Developed \Vater Quality was to be addresscd as a dead storagc/setUing tank locmed <br />upstrcam of the detcntion tank cyual to Aie volumc of ihc developed 6-month water <br />quality stoim. All stormwater tlows from the paved surCaces wcre to be collected and <br />conveyed through the upstream end of thc water quality tank. The City of �verett staff <br />has indicated that because the project is commercial, the open pond requirements apply <br />�- even thoueh the new paved area is less than 10,000 SF. Since the site arezi available is <br />very limited, a water quality pond is not suitable for die location. <br />VVATER QUALITY DESIGN CRITCRIA <br />For a commercial with less than 10,000 sf of proposed pnvement, the water quality BMP <br />� must be addressed as a combination open/closed system. 7'his statement assumes [hnt it is <br />not practical for reasons of topogrnphy, soil conditions, etc. to dispose of the design <br />volwne of nmoff by infiltration. For the instant project, wnditions are as follows: <br />( <br />a. The total volume must equal the 6 mo.-24 hour developed stonn; <br />I'or the Sunrise Services proposal, the required volumc is G25 CF. <br />b. The Snn�a Barbnra calculation method is acceptable; <br />� a The "pe�mnnent" pool starage volume shall bc equal to the volume of nmo(f in <br />the G-month �'�'Q storm. ]n the instant casc, the volume equals 332 cf for the 6- <br />month storm runoCf from the asphalt surfaces. Pervious areas wilf not be directed <br />to the storm drains. <br />i. The maximum volume of the open water cell is SSO7a of the peimanent <br />L pool volume. Max. Volumc = 0.85 * G25.0 cf = 531 cf. <br />ii. The minimum of the shallow treatment cell is 15% of die permanent pool <br />volume. Min. Volume = 0.15 * 625 cf = 93.75 cf. The i reatment cell <br />must be 94 cf or greater with a minimum depth of LS feet. <br />� d. The wet pond water quality volume is divided bctween an "open watcr" cell and a <br />wetland treatmen[ celL Thc miniminn depth in the opcn water cell shall be 3 fee[ <br />deep. In the instant case, with less than 10,000 sf of paved surface areci tributary <br />to detention, we have selected a 3.S diameter stora;c cell anchored with two 54" <br />manholes. <br />[ <br />I <br />wesr�a<u rvr,in�asi<s. i.�c � rao�ecr:ni-�o7, <br />� 3 <br />