Laserfiche WebLink
SUMMA(iY OF TRIP GENERATION RA'TES <br />LandUselBuildingTyp'2 ��ne�� ��£__fi�P� TinciPr 'I00,000 (',.,S.F. ITELandUseCode �� <br />Independent Variable—Trips per —1Tnn rrnc� Gn�,aro FPP�" nt' Ri,t � di na Araa <br />-.�era e Number Average Size ol <br />Tripg Maximum Minimum Correlation ot Independent <br />�ate Rate Aate Coellicient Studies VariablelStudy <br />Average Weekday Vehicle Trip Ends <br />Peak A.M. Enter 1. 4 1. 0 1. 28 2� • <br />Hour Between Exit <br />oj 7 and 9 Total o <br />Adjacent P.M. Enter <br />Street Between Exit <br />Traffic 4 and 6 Total q <br />Peak A.M. Enter <br />Hour Exit <br />�t Total o <br />anerator P.M. Enter <br />Exit <br />Total <br />Saturday Vehicle Trip Ends <br />Peak Enter <br />Hour ot Exit <br />Generator Total � <br />Sunday Vehicle Trip Ends <br />Peak Enter <br />Hour at Exit <br />Generator Total 4 <br />SourceNumbers 5 21, 54 � 88, 89 92 98 100 <br />ITE 7echnical Committee 6A-6—Trip Generation Rates <br />Date: 1q82 – <br />G.S.F. = Gross Square Feet of Builcing Area <br />