Laserfiche WebLink
Sent By: Zipper Zeman Associates, Inc.; JetSuite; May-12•99 18:06; Pa e 3/5 <br />9 <br />Rodlntd Toyau Clud Vehicle Lut J•237.(0 <br />Everat[, Waehington t2 btay 1999 <br />Page 2 <br />tbe mimerical values �egarding mittimum vcrtical geogrid spacing and minimum geogrid len�ths <br />ccquired for the various sect:oa4 of rockery es a fvnctioa of rockery heieht We have assumed a <br />uaffic swcharge of 260 pounds per square foot (ps� in consideration of the eaticipate veiricle <br />stoc�e above the rockeries. <br />It is our rccommendation that Teasar SRI/[TX1400 Uniaxial Geogrid, or equivalent, be <br />utiliud for the fill embanl�rnts which face rockeries tailer than 4 feet Tensar SS2/BX120� <br />gsogrid, or equivaleat, is �ecommended for 4-foot high rockerics. Whcn placing t}u geogrid on <br />the soil surfece, the front face of the yeogrid layer may be extended through the crwhed rock <br />back5ll behind the fa.,-ictg rocks. We recommend tLat both the froat and bai;k ends of each <br />geogtid leyer be secur�d ia tension prior to placcment end compaction of the structmal fill. <br />muter;al above each geo�tid layec. This can be accomplished by staking the grids in place. <br />9uKace Water MnnaQement Pond Coueideradone <br />We received from CG Engineerine a cross scctional detail illustcating the conGguradon <br />of the surface water mena�ement pond pmposed for the uortheastern porfion af the site. The <br />plaa depicts the pond and the edjscent rockery. We undcrstand that the pond will re desi�cd as <br />a`�vet pond", wiih a normel water levcl of elevation 473 fect, aud a hi�h water level of elcvacion <br />473.4 feet Based upon our review, we offer the following recommendations: <br />The pond is shown siwued relatively ciose ro the rockery. In conside:ation of the <br />rccommended geogrid reinforcement of the fill embanl�ent in wluch the pond will be <br />conshvcted, wc recommend that the pond be maved southward froni tl:e posirion shown such <br />thxt the geogrid reinforcemcnt 2one is set back &om the pond surface a minimum 2-foat <br />distance. <br />We recommend that the fill material in the area which wili house the pond contain at leact 30 <br />perccnt fina (that soil fraction pavsing che U.S. No. 200 sieve) in otder to limit watcr <br />exfiltration. Should a lower permeability be desiizd, we su�gest that considerarion be given <br />to tilling powdered bentonito clay into the upper I-foot of the iaterior pond surfuce, We <br />suggest that 15 percent by weight beatonite be addcd to the soils, blendcd well at the soil's <br />optimum moistuce contmt or slighdy above, attd compacted to the reeotntnend 90 percent <br />densiry (AS1M:D-1557). Alumatively, an impesmeable synthetic liner, such as PVC or <br />FIDPE, could be installed. <br />• Surface drainage ai the base of the fill slope plenned for below, and north of, the rockery to <br />provide a flowpath for nmoff or seepage. 'Ibe flowpath should direct all nuwff from thc siu, <br />ead the apartmeats located near the north property boundary, to an appropriatc surface water <br />discharge. <br />Zjpoa Zeman ,Wociasa. Inc. <br />192]l36'AvsnueWu45uiteB3D1 Lyno�.w4Wa.bingim9lO76 (4251771•3701 <br />