Laserfiche WebLink
EROSION AND SEDIMENTATION CONTROL DESIGN <br />There are several low spots proposed throughout the site which will serve as sediment <br />traps during grading activities. The sediment traps will be connected by interceptor <br />ditches for overflow purposes and will eventually discharge to the location of the <br />propo�^d wetland treatment cell at the northeast comer of the site. This sediment trap will <br />discharge into tlie existing ditch near Rainier Drive. The wetland treatment cell provides <br />1,127 cubic feet of storage. Sediment trap calculations indicate that 1,208 cubic feet of <br />storage is reqv�red. The six low points and interceptor ditches throughout the site will <br />accommodate the remaining 81.5 cubic feet. Each low point will be a minimum 1 foot <br />deep. <br />