My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7125 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7125
>
7125 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 3:03:59 PM
Creation date
2/9/2017 11:20:18 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7125
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WAT�R QUALITY TREATMENT FACILITIES <br />Water quality treatment facilities will consist of a deep cell and a wedand treatment cell. <br />The deep cell will be situated underground in a wet vault which is sized to contain 85 <br />percent of the runoff volume for the 6-month, 24-hour design storm event for developed <br />conditions. The wedand treatment cell is situated above ground and has been sized to <br />hold 15 percent of the volume for the 6-month, 24-hoi�r design storm event for developed <br />conditions. The water quality facilities aze designed to trea! Phase 1 pavement runoff only <br />and to not collect and treat runoff from Phase I roof area. <br />Two pipe arch tanks are proposed to provide storage for the deep cell portion of the water <br />quality treatment system. Each cell is 100 feet long and provides a storage pool of less <br />than 6'. The deep cells will discharge into the wetla�d treatment cell which has a has a <br />permanent pool depth of 2.5 feeL The wetland treatment cell will dischazge into the <br />detention tank system. <br />The following parameters were used to design the water quality treatment facilities (see <br />appendix): <br />Phase 1 <br />Developed impervious area - pavement <br />Developed pervious area — landscape <br />Rainfall — G month <br />Developed Tc <br />Runof[ �: olume — 6 month <br />2.45 acres/CN 98 <br />034 acres/CN 86 <br />0.99" <br />63 min (default minimum) <br />7185 cf <br />�7��� P�s�- � <br />
The URL can be used to link to this page
Your browser does not support the video tag.