My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7404 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7404
>
7404 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 10:59:47 AM
Creation date
2/9/2017 11:38:41 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7404
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan review <br />Alfy's Pizza <br />Page 2 <br />chicken nrep addition <br />Ir.n ��2 <br />September 15, 1983" <br />7 <br />0 <br />Your equipment cut sheets and the layout plan show two new <br />N.S.F. sinks. The one compartment sink with the one drain- <br />board is strickly for food prep work. The two compartment <br />sink with two drainboards is for scullery work (pots and <br />pans). The sinks will replace the existing three compart- <br />ment sink which is not N.S.F. apnroved nor has drainboards. <br />The plan review was made from information you presented <br />to our office. Therefore, should there be any major changes <br />and/or additions to your layout plans and equipment specifi- <br />cations, you must notify the Snohomish Health District of <br />the changes. . <br />It should be pointed out that the health deoartment annroval <br />of the finish installation (equinment and facilities) is <br />subject to the final field inspecti.on. Therefore, when ready, <br />you should call for the final field inspection. <br />In 1980, the Snohomish Health District's Board of Health <br />established a plan'review charge for review of all layout <br />plans and specifications. The fee schedule is $26.50 per <br />hour to a maximum of $300.00 (1983 revised fee schedule). <br />Your total review time is two (2) hours. Therefore, there <br />will be a$53.00 charge. Depending whichever comes first, <br />the plan review charge must be paid before the addition is <br />completed or within thirty (30) days of the plan review. <br />Should you have any questions regarding the above, please feel <br />free to contact our office at 259-9537. <br />Very truly yours, <br />� 4'., <br />rjta <br />John W. Lorenz, R.S. <br />Environmental Health Specialist III <br />JWL: <br />cc <br />dmb , <br />��ity of Everett Building Department <br />Washington State Liquor Control Board <br />�° r j.� � L'I r�' U <br />� r �'1 � <br />.. - . I:''�.� <br />CITY OF EV�RE7? <br />If�spection pept <br />
The URL can be used to link to this page
Your browser does not support the video tag.