My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7430 EVERGREEN WAY MCDONALDS 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7430
>
MCDONALDS
>
7430 EVERGREEN WAY MCDONALDS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 12:56:16 PM
Creation date
2/9/2017 11:44:07 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7430
Tenant Name
MCDONALDS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ CLOSED CM WORK ORDERS REPQRT <br />Total Utility Maintenance ManagemenL- System <br />07/28/1998 Page 1 <br />- --------------------- <br />------- ------------------ <br />______________________________;_________________________- <br />Date Range :06/24/1900 - 07/28/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751506 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity AL"u <br />----------- <br />CM WORK ORDER ID: 7101196751506 Title: REPAIR 7430 EVERGREEN WAY <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 07/16/1998 <br />Overall Craft: <br />Issued: 07/15/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />WST BBT: <br />DLI MTL2 <br />Materials: <br />ID <br />CLAM44021747 <br />Issued by: GJ Assigned to: BBA <br />Priority: Travei Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs <br />------------------------------ <br />----------- ------- <br />BRADLEY, BROCK A. 0.00 1.00 <br />MARKHAM, TIMOTHY L. 0.00 1.00 <br />Description <br />------------------------------ <br />CLAMP REPAIR 6" 7.40-7.80 STLS <br />Total Labor Cost: <br />Cost <br />---- 20.62 <br />9.50 <br />30.12 <br />Date # Used Cost <br />-------- -------- ---------- <br />07/15/1998 1 67.33 <br />Total Material Cost: <br />Vehicles: <br />ID Description Hours Cost <br />----------- <br />- ------------------------------ <br />------ ---- - <br />V2156 89 DODGE 1 TON 1.00 ______5_00 <br />Total Vehicle Cost: 5.00 <br />Work Description: <br />------------------------------------------------------- <br />CONTRACTOR HIT ABAN'JON SERVICE. SERVICE UNMARKED• <br />67.33 <br />Total cost for work order 7101196751506: . 102.45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.