Laserfiche WebLink
PUBLIC WORK <br />Item Unit Quantity Unit Price Amount <br />STORM SEWERS <br />6 inch pipe L. F. 20.00 <br />8 inch pipe L. F. 20.00 <br />12 inch pipe L. F. 25.00 <br />18 inch pipe L. F. 30.00 <br />24 inch pipe L. F. 35.00 <br />Unsuitable excavation, (2' over depth <br />and ballast) L. F. 2.50 <br />Standazd Catch Basin Ea. 700.00 <br />Exua depth excavation, (over 12'deep) Ft./L.F. 2.00 <br />48 inch MH/CB Type II Ea. 1800.00 <br />54 inch MH/CB Type II Ea. 2700.00 <br />Extra depth MH/C3 <br />48 inch per ft. over 12' Ft. 110.00 <br />Extra depth MH/C3 <br />54 inch per foot over 12' Ft. 140.00 <br />RestrictodPollution Ctrl. <br />12 inch and lazge Ea. 340.00 <br />O[her <br />STORI�i SEWERS TOTAL S <br />