Laserfiche WebLink
J <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System Wage 1 <br />03/07/1996 <br />Date Range :01/09/1989 - 02/29/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern 7101236710061 <br />Item Range :<Blank> - WW22020001 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101236710061 Title REPAIR 7601 EVERGREEN WAY <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: DCB078SL40 -- CATCH BASIN <br />Location ID: -- Activity 671 <br />Program 710 Function 123 y <br />Date Completed: 02/21/1996 <br />Overall Craft: <br />Issued: 02/20/1996 Issued by: HDA Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: HL/AS <br />Labor: <br />Planned Hrs Actual Hrs <br />Cost <br />Craft ID <br />Name <br />---------- <br />---------- <br />------------------------------ <br />0.00 <br />5.00 <br />94.90 <br />HEO AAL <br />ARNOLD, ARTHUR L <br />0.00 <br />1.00 <br />21.34 <br />SUP1 AGA <br />AHLES, GREGORY A. <br />0.00 <br />2.00 <br />36.20 <br />EO GMJ <br />GREWING, MELVIN J. <br />0.00 <br />2.00 <br />29.82 <br />UL HRT <br />HANSEN, ROGER T. <br />0.00 <br />5.00 <br />60.60 <br />UL MHA <br />MAROON, HERBERT ARTHUR <br />0 00 <br />4.00 <br />73.52 <br />EO MJL2 <br />MITCHELL, JEFFREY L. <br />0.00 <br />2.00 <br />38.24 <br />CF SRA <br />SORGEN, ROBERT A. <br />---------- <br />Total Labor <br />Cost: <br />354.62 <br />Materials: <br />Date # <br />Used <br />Cost <br />ID <br />Description <br />---------- <br />BRIC00061156 <br />BRICK CONCRETE 2" X 4" <br />X 8" 02/21/1996 <br />02/21/1996 <br />15 <br />1 <br />6.00 <br />CEME00061438 <br />CEMENT 20 MIN. SET 50 <br />LB. BAG <br />--- <br />Total Material <br />Cost: <br />( 17.13 ' <br />Vehicles: <br />Description <br />Hours Cost <br />ID <br />------ ---------- <br />------------ <br />V2147 <br />------------ ------------------ <br />87 CHEV 1.5 YD <br />2.00 <br />4.00 <br />19.68 <br />171.20 <br />V3507 <br />88 CASE BACKHOE 4X4 <br />--------- <br />Total Vehicle Cost: 190.88 <br />Work Description: <br />---------------------------------- <br />REPLACED FRAME AND GRATE. <br />