My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7601
>
BASE FILE
>
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 4:07:22 PM
Creation date
2/9/2017 11:59:30 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amoeiatea Hoofing, Lie. (� — <br />ASSOCR116206 v PROPOSAL AND CONTRACT <br />3121 N.E. 133rd • Soallle,'Washinglon it <br />tm x . W.In EnplxM mmr.n.'W.; •u.,' AM'mr mr.n. <br />P.O. Box 82894 n.a-m.e nwlmp, im. •r... e,.... . e�xrr.r. <br />Kenmore, Washington 98028 <br />364.4445 • i (800) 358-3119 • Fax 368-2303 Page 1 of <br />PROPOSAL SUBMITTED TO: 1`110NE: 747-1825 DATE: ,TUNE 20, 1997 <br />JANET COOPER CASCADE PLAZA <br />ASH PROPERTIES STImET: <br />7601 EVERGREEN HAY <br />14335 NE 24TH, #202 City, STATE: <br />EVERETT, WA rJ <br />VIA 98007 FILE CODE. <br />BELLEVUE O <br />r D26 /2T / RNS-jm6 D <br />PROPOSAL: We are plonsod to submit this proposal a furnish the materials and Perform the labor to: <br />INSTALL U.S. INTEC <br />G BSP4 GRANULAR SURFACED HODIFIED DITUIIEN TORCHDOWN ROOF SYSTEM: <br />SCOPE OF THE WORK: Tho speak scope of the work I« tins plot Is: <br />SECTIONS "B" AND "C" / PRIORITY Al <br />1. Remove edge metal and haul away for disposal. r <br />2. Tear -off and remove the existing roofing (approximately 1-1/2"thick) and <br />dispose Of complying with current environmental regulations. By acce_ptan <br />Of this contract, the owner or owner's representative stating to the bes <br />of their knowledge there is not the existence of any asbestos containing <br />materials that will be disturbed by the performance of the specified wor <br />Note, Additional layers of roofing will be removed at an additional Cos <br />Inspect: the roof deck (substrate) condition. Advise the owner or owner' <br />representative of findings. With approval, remove_ and replace decking o <br />a tine and material basis; hourly labor rate at $42.00/hr plus material <br />and rental equipment at cost (plus 15% general and administrative fee). <br />4. Replace lead (lashings oh plumbing vent pipes. <br />076,, Install one ply 281b. fiberglass base sheet and mechanically fasten with <br />simplex stronghold nails. - <br />Install an U.S. Irl GBSP4 granular surfaced single -ply modified hitume, <br />roof system per manufacturer's specification p2BGBN. This is a torchgra <br />membrane with a manufacturer's twelve (12) year material and workmanship <br />warranty. <br />8. All cants, curbs, and sharp angles will Have extra flashing materials <br />installed per manufacturer's specifications. <br />9. Install new 26 gauge sheet metal edge flashing with baked enamel finish <br />using neoprene washered galvanized nails. <br />10. Clean up and remove debris from contracted work. <br />OTHER ITEMS INCLUDED IN THE SCOPE, OF WORK <br />A. Raise mechanical units, install specified roof system, loose lay an <br />additional layer of cap sheet under unit support timbers locations; reset <br />existing timbers and/or replace damaged timbers with pressure treated <br />wood and reset mechanical unit(s) on support timbers. <br />B. Furnish and install new treated wood blocking under gas pipes and <br />electrical conduJt routed across roof. <br />C. Furnish and install aluminum metal termination bar with caulk joint where <br />roofing membrane terminates on the vertical surfaces. <br />D. Furnish and install galvanized sheet metal Pitchpan(s) where necessary. <br />Seal in pitchpan with specified roofing materials. Fill pitchpan with <br />plastic roof cement. I <br />NOTE, COST EXCLUDES CITY OF EVERETT BUILDING PERHIT. UPON AWARD OF CONTRACT <br />ASSOCIATED ROOFING WILL OBTAIN AT OWNER'S EXPENSE, <br />THE FOLLOWING PLANS AND SPECIFICATIONS ARE A PART OF THIS SCOPE OF WORK: <br />FIFTY TWO THOUSAND ONE HUNDRED & NO/100 <br />TERMS AND CONDITIONS LISTED ON REVERSE SIDE, <br />The prices on this pmPosal are effective for <br />Dollars <br />52,100. <br />It <br />nws suss TAX <br />WARRANTIES: Our warranty for mnerranshio, as described on the rovmso SIDE. Is for TWO <br />The manufacturer's warranty, which Is dascnbod a their warranty which will be provided la you, Is for �n <br />AUU101mED BY <br />ACCEPT Ah-E OF <br />This Proposal is accepted. The swim of work, price. Terms and conditions con <br />the front and reverse of Ihis document constilute the cemmcl. <br />SIGn11UAE <br />TITLE <br />DATE <br />RETURN ORIGINAL OF THIS PROPOSAL TO: P.O. BOX 02894, KENMORE, WASHINGTON 90028 <br />
The URL can be used to link to this page
Your browser does not support the video tag.