My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
7601
>
BASE FILE
>
7601 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 4:07:22 PM
Creation date
2/9/2017 11:59:30 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 23, 1981 <br />Reininga Corporation <br />Attn: Mr. Alan Roodhouse <br />425 California St. <br />Suite 2100 <br />San Francisco, CA 94104 <br />Subject. Storm Water Detention System at <br />601.13.ver green - Everett <br />Dear Mr. Roodhouse: <br />Cascade Shopping Center <br />.M <br />To ensure proper stormwater management, the City of Everett Engineering <br />Department will be routinely inspecting privately owned storm water detention <br />systems on a yearly basis. Careful attention must be given to the maintenance <br />of these drainage systems. It Is the property owner's responsibility to regularly <br />have all the catch basins in the system cleared of sediment, in particular the <br />catch basin housing the flow restrictor. if the restrictor becomes clogged, the <br />detention system will not function and the potential for flooding and for pollution <br />of the receiving water body increases. <br />The drainage system at the above address was recently inspected by City staff <br />members. <br />We found that both restrictor catch basins need to be cleaned. The pond restric- <br />tor Is not equipped with a chain to control the slide gate on the outlet pipe. It is <br />essential that this chain be installed so that the gate can be open from outside of <br />the catch basin in the event of a flood. <br />This work must start within 30 days of your receipt of this letter. Please notify <br />this office in writing when the work is completed. If you have any questions <br />regarding this matter, please call Dan Mathias at 259-8811. A copy of the City <br />of Everett Drainage Ordinance Is enclosed for your Information. <br />Sincerely, <br />ALFRED R. THEAL <br />Public Works Director <br />y: ban Mathias <br />Assistant Engineer <br />DM:KG:mgh <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.