My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY LAI GONG RESTAURANT 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7601
>
LAI GONG RESTAURANT
>
7601 EVERGREEN WAY LAI GONG RESTAURANT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 5:48:14 PM
Creation date
2/10/2017 12:07:14 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
LAI GONG RESTAURANT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Jinhong <br />Page 3 <br />February 20, 1981 <br />11. a. All exposed concrete masonry walls must be covered with drywall, <br />smooth plaster, tile, plastic laminates or any other smooth, non- <br />absorbent, and easily cleanable material (lcitchen and restrooms only). <br />Epoxy enamel masonry paint does not give a smooth wall finish. <br />b. High splash areas (food. preparation, d�.shwashing, scullery, and rest- <br />rooms) should have more resistant finishes than just paint. Even <br />though painted wall finishes are approved in kitchens, they are not <br />too resistant to high wear and moisture. <br />c. Walls and ceilings in the kitchen and restrooms must be light colored <br />to aid in the distribution of light so as to help facilitate thorough <br />cleaning. <br />d. Kitchen ceiling tile should be cleanable. <br />12. The quarry tile floor (kitchen and r�strooms) must have a cove base. <br />13. If the mezzaine floor is used for storage, it must have a smooth,. <br />nonabsorbent and easily cleanable floor and wall finishes (not in- <br />dicated or layout plan). <br />14. The back assembly of the cocktail bar must be an enclosed structure <br />------no exposed 2" x 4" or 2" x 2" structures. <br />15. Adequate facilities must be provided for the orderly storage of <br />employee's clothi.ng and personal belongings. <br />16. Provisions must be made for the sanitary disposal of leakage and <br />drainage from the garbag� and refuse area. <br />17. The plan review �vas made from information you presented to our o£fice. <br />Therefore, should there be any major changes and/or additions to <br />your layout plans and equipment specifications, you must notify the <br />Snohomish }Iealth District of the changes. <br />18. �Ct should be pointed out that the health department approval of the <br />i'inish installation (equipment and iacilities) is subject to the <br />f'inal field inspection. Therefore, when ready, you should call for <br />the f zal field i_nspection. � <br />19. Iii 1980, the Snohomish Health District's Board of Health established <br />a plan review charge for review of layout plans and specifications. <br />Tt�e fee schedule is $25.00 per hour to maximum of $250.00. Your <br />tctal review time will exceed ten (10) hours. Therefore,,there will <br />be a$250.00 charge. The fee must be paid prior to issuing a food- <br />service permit to the restaurant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.