Laserfiche WebLink
As indicated above, the overall impacts of the business park and <br />residential project alternative vary little (see Barton-Aschman Addendum, Appen- <br />dix B)• For this reason, the effects at mitigating the various impacts would be the <br />same for either alternative. <br />Additional mitigating procedures recommended by Barton-Asch- <br />man and the City include: <br />1. Provision of an ex:lusive right turn lane from northbound <br />Evergreen Way to eastbound 75th Street to improve the intersection and the access <br />to the proposed development; <br />2. Provision of a continuous two-way left turn lane along the <br />development's 75th Street frontage to allow safe and efficient left -turn access to <br />and from the center; <br />3. Provision of a brief deceleration "right 'urn only" lane at the <br />Evergreen Way entrance driveway; <br />4. Provision of an acceleration lane north of the Evergreen Way <br />driveway to assist existing vehicles in entering the Evergreen Way traffic flow; <br />5. Restrictions in the tenant leases prohibiting truck traffic from <br />using the Evergreen Way entrance to the center; <br />6. Provisions of a paved pathway for pedestrian movement along <br />75th Street between the shopping center and Beverly Boulevard; <br />7. Provision of curb, gutter and sidewalk improvements along the <br />Evergreen Way and 75th Street frontages of the shopping center; <br />_ ftw,wV���oP�sec� <br />-1. _-- <br />8.o's_sihleiremnv 6�change=tgexit n�yt,�n 1ie�75th Street <br />driveway entrance nearest to the 75th Street/Evergreen Way intersection; and <br />9. Possible widening of the 75th Street frontage to improve flow <br />to and from the center. <br />The sponsor expects to -absorb the costs of items 3, 4, 6 and 7 <br />above. However, with respect to the cost of items 1, 2, and 9, and a traffic light <br />on Evergreen Way, if necessary, the sponsor is not prepared to make a commitment <br />until the extent and cost of the improvements is known. Items 5 and 8 involve no <br />cost. <br />3. Public Services <br />(a) Fire <br />Existing Conditions. The project site falls within the area served <br />by the Everett Fire Department and the nearest fire station is located at S. IV. <br />68th Street and Beverly Boulevard. Average response time is two minutes. First <br />response includes two pumper units, an aid car and a battalion chief. <br />