My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7815 EVERGREEN WAY BUILDING B 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7815
>
BUILDING B
>
7815 EVERGREEN WAY BUILDING B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 4:00:23 PM
Creation date
2/10/2017 12:34:36 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7815
Tenant Name
BUILDING B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b• <br />December 31, 1986 <br />F�bar Equites Corp <br />1100 Virginia Street #210 <br />Seattle, Wa 96101 <br />SUBJEC^_': 7807 Evergreen & 7815 Evergreen, <br />Noti£ication oP Substantial <br />Completion of site improvements <br />and punch list <br />•pi.�ti � <br />'� �l\ <br />. ufh`S:•.fe"�.r. <br />t ' <br />�f y�.'r i.e %" i <br />the Evergreen <br />CI7V OF <br />everett <br />FL'3C�'.'.'C:✓.5 CE'r%�:'.:c!•i <br />T^0 C[O�a ST-EB <br />_.cFr� �'�;,c41NG',;'. <br />=aze� <br />After a review of the above mentioned site with regards to public street <br />improvements, parking lot paving and underground iitilities, on December 30, <br />1986, the Public Works Dept, has found that th� £ollowing items are <br />generally completed; <br />1 <br />2 <br />3 <br />4 <br />Underyround stoxzn drainage system for parking lot (including catch basins, <br />pipe and connectior. to city system) is installed. <br />Underground sewer system is installed (Including manholes, clean-outs, <br />and pipe). <br />Water services aze installed (Domestic and fire protection). <br />A-I Curb, gutter, and sidewalk along property Prontages (excluding <br />approximate 50' along south end) is completed. <br />5. Parking lot paving for lots 1& 2 is completed and striped. <br />The following items are a•list oF things that need to be attended to be£ore <br />the Public Works Dept. will sign off this job as completed; <br />l. As-built drawing for the underground utilities must he sumnitted to the <br />Public Works Dept. Including, but not limited to, water meter locations, <br />sewer elevations, and changes made to storm drain system. <br />2. Completion of the A-1 curb, gutter, and sidewalk on Ewergreen S<ay along <br />with a 6' x 3C' section of asphalt adjacent to curb in same area (4" of <br />asphalt on 6" o£ crushed rock). <br />3. Raise water valve to grade. <br />,_I�� 4. Complete grouting around and under catcn basin £rames in storm sewer system. <br />1V <br />
The URL can be used to link to this page
Your browser does not support the video tag.