My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7825 EVERGREEN WAY 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7825
>
7825 EVERGREEN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 2:41:36 PM
Creation date
2/10/2017 12:37:53 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7825
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC L� '1 <br />[+7 t+1 <br />A�x <br />>H� <br />� <br />K n <br />H �7 <br />�H�1 <br />Vi H <br />�O� <br />H t7 <br />O«�H <br />l^i[�+f0 <br />•. V �q <br />9Ht+i <br />y <br />t HH <br />8 �' <br />H <br />O t7 fn <br />��� <br />zycn <br />H O Cn <br />" s <br />� �� <br />� . , '� <br />Ci'IY OF EVFI2EI'C <br />BIIILDIVG I*!SPECfIOV DEPAR'I?�YC <br />D�� Sentember 26. 1986 <br />O1V�IER Standard Brand Paint <br />CO.VffL1CT0R R w Huff Construction <br />USE <br />USE ZOVI\G <br />OCCUP�\CY GROUP <br />DESIG,,IER OCCUP:WC LOAD <br />JOB SITE ADDRESS p�.a.v c�cx no. aei���ss <br />'fYPE OF CO�STRULTIOV PIA�� REVIEI4ED BY _ <br />The plans for the above project will be anproved unon receipt of a letter from the <br />applicant describing in detail the means of correcting and/or comnlying with the <br />items listed below. Means of correction and/or comnliance must be aoproved by the <br />Building Department. <br />Item No. <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />Area Requiring Code Compliance <br />Roof insulation i.s called ou�: on Section A/4 as R-19, but energy <br />calculations �re�uire R-30. <br />Roof insulation can not be located directl}• under the r��f sheathing <br />because of the virtual impossibility of oroviding a continuous vapor <br />barrier. It r.lso cannot be supoorted on trie suspended ceilirg. <br />Please advise proposed solution. <br />2 x 6 braces of the false front r.must be pressure treated. <br />Space above entrance (C/A-4) mus� be ventilated. <br />Detail A/A-7 should show the R-8 rigid insulation required by the <br />energy calculations. <br />Condensation will form on the interior surface of the uninsuJ.ated <br />exterior conerete walls during the winter heating season. Architects <br />and mechan:cal engineezs in this region are not comfortable with such <br />a design even thcuyh it apnears to satisfy the State Energy Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.