My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7915 EVERGREEN WAY 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7915
>
7915 EVERGREEN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:19:33 PM
Creation date
2/10/2017 12:44:54 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br />BARGHAUSEN �+ONSUL.TING ENGINEERS� INC. <br />"Land Planning, Survey, and Design Specialists" <br />�o�L�'l�l�U �' �U <br />LI LI <br />nTarch 5, t�o MAR 6 1940 <br />EVERETT BUILDING DEPT. <br />Mr. Tim Tyler, Building Official <br />Ciry of Everett <br />32D0 Ccdar Street <br />Evcrctt, WA 98201 <br />RE: IIuiidine Permit Annlication tor the Proposcd ARCO AM/PM Mini-Market Facility to be <br />Constructed at thc Southcast Corner of Evcrgreen Way and 79th Place, Everett, Washington <br />ARCO FAC No. 5702/Our Job No. 3330 <br />Dear Mr. Tyler: <br />Our ofGce is representing the Atlantic Richficld Company for the developmcnt oC a new ARCO <br />AM/PM Mini-Market facility to be constructed at thc above-refcrenced loption. This projcct will <br />includc the constrvction of a 2,700-square-foot singlc-story wood-frame convcnicnce market and a <br />Crcestanding canopy, togethcr witl� gasoline pump islands and Cour 10,000-gallon underground gasoline <br />storage tanks. <br />At this time, we wauld like to transmit the following items and documenu Cor the purpose of <br />obtaining a commercial building permit for building, canopy, signs, undcrground storagc tanks, grading <br />permit, permit to work in the right-of-way, public works permit, sewer �ctension permit, w�ater meter <br />and water cons[ruction permit, mechanipi permit and ptumbing permit. <br />Enclosed, plcase find the Collowing documents for your revicw anJ approval: <br />1. <br />2 <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />Building permit application for the building and pnopy. <br />Tluee wmplete sets of construction drawings Cor the proposecl building structure and <br />associated site decelopmen4 <br />A chcck madc payable to the City of Evcrctt as requircd (or building permit appli�tion. <br />'IWo copies of the cnergy calculations for the proposed facility. <br />Four copies oC the site plan and (our sets of civil plans for public works revicw. <br />TWo copies of the storm detention calculations. <br />One copy of thc Icgal description. <br />Determination o( nonsignificance (SEPA No. 1d2-89). <br />Please proceed to process the endosed documentation for the purpose of issuing the commercial <br />building permits. As our clicnt is anxious to obtain thc appropriatc permits, we would likc to initiatc <br />any city ovcrtime poliry and/or fecs to cxpeditc permit rcvicw proccss. <br />Home Office: 18215 72nd Avenue South • Kent, Washington 98032 •(206) 251-6222 <br />Sacramento Office: 3750 Auburn Bivd., Suite A• Sacramento, California 95821 •(916) 484-1212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.