Laserfiche WebLink
runoff tu entcr on the subject property trom the west. It is obvious that stormwater runoff will not <br />� drain o�to the subject propetry Crom the north or east as dictated by topography. There is a small area <br />° immecli�tely south of the subject properry that curtently drains onto the site. The proposed project will <br />mnintain the ebsting drainage patterns, and the proposed storm drainage system shalt be sized to <br />adequatcly handle this otf-site stormwater runoff. <br />ON-SITE DRAINAGE CONSiDERATIONS: <br />17ie subject property consists of one drainage basin which currenqy discharges stormwater as sheet llow <br />to the northeast as dictated by topography. The project site wilt be regraded to minimize pavcment <br />slope and to maintain ptisting drainage patterns. A storm drainage system will be provided for this <br />project in accordance with City ot Everett standnrds an! guidelines. The system, as designed, will be <br />rclatively maintenanc�trce and provide the required bioCltration, via grassed-lined svales. In addition, <br />an oilhvatcr separator will be provided tor further removal of pollutants from storm water, prior to <br />discharging from the site. The proposed stornt drainage shall be sized to adequately hand2e runoff <br />producc,�l by 25-year storm. Ylease rc[ercrce the drainage and pipe sizing plculations provided in this <br />tepor� <br />� <br />� 3330.15 -2- <br />3 <br />