Laserfiche WebLink
The wetvauit(s) and/or wetpon�(s) must pass a leak test before the project w;�� <br />receive final approval. The vault and pond must <br />elevation of the outlet;, and inflow to the vault a d f Iled with water to the <br />24-hours. To pass the leak test, the water elevationpmad must be prever.' �d for <br />inches in the 24-hour period. 7he pond soils should b� saturated before <br />beginning the 7_4-hour test oer(od. y n°t drop more than 2- <br />�/ <br />7 <br />