Laserfiche WebLink
7. Rcsponsc to comments to pagc 6 of 6— <br />rigun; and runoff culculations modified as rcqucstcd. <br />3. Response to comments to Appendix A– . <br />Page L• �xisting and proposed areas modified as requested. Bypass avoided by <br />installation of an additional catch basin. <br />Yage 2: Description added as requested. <br />9. Response to comments to Appendix B– � <br />Area and runoff calculations modifiecl as requested. <br />Plcase feel free to contact me ut our ofGce (206) 340-2255 if you have any ques[ions <br />re�arding our responses to the comments or any other questions about the plans. <br />Sincerely, <br />ANDERSEN BJORNSTAD KANE JACOBS, INC <br />��C��— .' <br />el R. Paulson <br />Project Engineer <br />a: <br />J <br />zf v <br />