Laserfiche WebLink
Pagc I of 2 <br />Meg Haley Mv��a�-aa-� <br />From: James Buchanan [james@axiomnw.com] <br />Sent: Tuesday, April 21, 2009 1:56 AM <br />To: Meg Haley <br />Subject: RE: davita everett roof top units Screening questions <br />Meg, <br />We are moving fonvard on the screening but I will need [o request a T.C.O. Temporary Cert Gccuppancy or a <br />Final while we are still working on the Screens. <br />Who do I need to meet with about this? <br />I invite you all to come by as we111���ddd ve i talled the� i sis system <3�id would love to shc� m those who are <br />interested. ////� // /[�� //�/G C� ����//-/ �✓ <br />Thank You. �j _/ u G v ,� `��('//� �c- �/ _ <br />James Buchanan C�� j �C:.�J/� �;x� �`��� � <br />Axiom Northwest Construction, Inc. � � �� ���'� <br />Main Office Fax 360.652.1718 �D��� ,�� O� <br />E-Fax 206.219.6690 �� � <br />Cell 206.954.5227 ,/Jn//'� <br />l��i�� <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.usj <br />Sent: Friday, March 27, 2009 6:03 AM <br />To: ]ames Buchanan <br />Cc: Teresa Firnstahl <br />Subject: RE: davita everetC roof top units Screening questions <br />Hi James, <br />Before the building permit can be issued, the planning and building departments sign off on the submittal after <br />their reviews have been comp:eted. Following is the building department status for permit review: <br />. Two complete sets are required. We received two sets at permit application, and only one of those sets <br />was replaced. My understanding is that the equipment schedule has been revised since the updated set <br />was dropped off for review. Please submit two sets to be reviewed with the structural letter that has been <br />sent via e-mail. It appears that the requirements for review have been met, but the economizer issue has <br />to be resolved on the updated equipment schedules, and another drawing set is required. We can't advise <br />you on how to proceed regarding ordering, since the permit has not been released for construction. As <br />soon as we receive the requested information, we will expedite the permit review. This will satisfy the City <br />of Everett Building Code review requirements. Then the submittal is given to the planning department for <br />review. <br />. An initial planning review indicated that screening is required. <br />. Engineering details and calculations are also required to determine that wind loading and other structural <br />concerns (deflection and shear) have been designed for the screening to meet the building code. <br />I am out of the o�ce today, 2nd will be in on Monday. Let me know if you would like to meet to discuss the <br />proj=ct, or if the requirements are clear. The screening requirement comes from the City of Everett Zoning Code. <br />-Meg <br />f•1eg I laley, NCARQ <br />Fngineeriny/Public Ser�ices � 3?_00 C��dar Street, second (loor � Everett, N1A 96201 <br />f-: -I �2`i7.E313 � P inhalpy �.i Ci ���. i.�t �:�tu'd I`:' h:tp'//c+crCtY�.a r.ry/d `aulLa5px71D=830 <br />-ii� � i�oo�) <br />