Laserfiche WebLink
Work ,Activity Worl: OrdPr <br />_ 1,;, ; <br />Ai?.i/`Lr�O'7 7:33 <br />Issued By CAG CRUM,GFRRY <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 2nsi2oo� <br />Fund ao� Account 5 Progra�n »o Funclion i�y Activity b6a <br />Program <br />TItlB SO 4 INCH 8413 EVERGREEN WAY 710119664 <br />Work Order No 20070150 PfOjeCt Activity Type CORRECTNE MAINTENANCE Sl21t15 CL <br />Date vzs�zoo� Time ia:o5 Original WO iz3a� Billing <br />M <br />M <br />M <br />M <br />M <br />M <br />M <br />A-0 <br />M <br />Type <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Type <br />P <br />P <br />P <br />P <br />P <br />p <br />P <br />P <br />P <br />P <br />P <br />VAt.V44040448 <br />CEMEOD061438 <br />ELL0420376J7 <br />MEGA42044547 <br />METE34141847 <br />PIPE42055247 <br />PIPE44055747 <br />SUPP42145947 <br />VALV42113248 <br />VALVE GATE fi MJ X FLG DI W/OP NUT 1 <br />CEMENT 20 MINUTE SET 50 LB. BAG RECRETE FAST SET G t <br />ELBOW 4 MJ 11-1/4 DEG DI (1/B BEND) 2 <br />MEGALUG 4 KIT 5 <br />METER 5/8 X 3/4 NEPTUNE W/PRO READ IN CU FT RADIO 1 <br />PIPE 4 TYTON JOINT DI CLASS 52 13 <br />PIPE 6 TYTON JOINT DI CLASS 52 13 <br />SUPPORT PIPE 4 ADJUSTABLE PIPE SUPPORT FOR 4 2 <br />VALVE 4 DOUBLE CHECK DETECTOR W/OSY FLG VALVES 1 <br />Na No Description <br />N/A 4 FLG KIT <br />N/A 6 FLG KIT <br />NIA TAP FEE <br />N�A 3/4 MINUS ROCK <br />N/A 4 FLG CPLG ADAPTER <br />N/A 4 FLG KIT <br />N/A METER NUMBER 83%58783 <br />N/A PEAGRAVEL <br />N/A ASPHALT (RINKER) <br />N/A CDI� (RINKER) <br />N/A VAULT (UTILITY VAULT) <br />ID <br />�GM2 <br />JJM <br />SJT2 <br />SDD2 <br />BGM2 <br />GTJ <br />JJM <br />SJT2 <br />SDD2 <br />S�K <br />BGM2 <br />Name <br />BEUKERS,GEORGE M. <br />JESMER,JEFFREY M. <br />SPOONER, JAMES T. <br />STALLINGS, DONALD D. <br />BEUKERS, GEORGE M. <br />GALLAGHER, THOMAS J. <br />JESMER,JEFFREY M. <br />SPOONER, JAMES T. <br />STALLINGS, DONALD D. <br />STU�RT, DARRELL K. <br />BEUKERS, GEORGG M. <br />Quanlity <br />1 <br />1 <br />10 <br />2 <br />2 <br />1 <br />t <br />1 <br />t <br />1 <br />Total NA Cost <br />Total Material Cost <br />394.049 03l28/2007 <br />13.624 04l02'2C01 <br />84.212 04/022007 <br />112.935 04IO2/2007 <br />zz�zsz oaia2izoo� <br />138.853 04l02I2007 <br />129.896 04/OZ2007 <br />1492A2 0410Z2007 <br />1191.132 04IO2/2007 <br />53,335.78 <br />NA Costs <br />Cost Billing Date Billing Code <br />525 03/2812007 <br />8.52 03/2812007 <br />15U 03/28/20G7 <br />170 04l02/2007 <br />200 04/02/2007 <br />10.5 04/02/2007 <br />G 04/02/2007 <br />77 04/02/20G7 <br />50.49 04/14/2007 <br />177.56 04/14/2007 <br />2521.04 04/14/2007 <br />53,310 36 <br />Perso,�nel Costs <br />Hours Cost Billing Date Earning Code <br />2 34.736 03/21/2007 <br />2 33.08 03/21/2007 <br />2 49.61 03/21/2007 <br />2 33.08 03121/2007 <br />8 768.8 03/28I2007 <br />6 165.552 03/28!2007 <br />8 732.32 03/2812007 <br />8 198.44 03l2EI2007 <br />f3 132.32 03/28I2007 <br />8 210.44 03/28I2007 <br />6 126.6 03/29I2007 <br />Class <br />