Laserfiche WebLink
INSPECTION REPORT ti Date: t ` Permit: (ZC -3 - D ( I <br />Contractor: �`I ✓��-c C-0 f e <br />Owner: 2li.-e_ " <br />Site Address: qOZ SG eV MX2_CC Wr tf <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ Slab/Conduit <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Fooling dr. s <br />❑ Roof dr i s <br />OR CONSUL <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />❑ LIFER ground <br />❑ Fooling <br />❑ Foundation <br />❑ Structural Slab <br />❑ Framing <br />❑ Insulation <br />f0 Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />Ceiling Grid <br />Building Final <br />MECHANICAL <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Rooftop Units <br />❑ Mechanical Final <br />GAS PIPE <br />❑ Rough In/Service <br />❑ Refrigeration <br />❑ Gas Pipe Final <br />APPROV ❑ PARTIALAPPROVAL <br />❑ OK F T.C.O. ❑ CORRECTION REQUESTED <br />[� FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: _. <br />❑ CALL (425) 257 E881 FOR REINSPECTION • 24 hour notice required <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />Hot Water Tank <br />❑ Rough In <br />❑ HWT Final <br />FINAL APPROVAL THIS <br />r <br />Inspector: <br />EIR(4109) _ --- s�arr.n7G'�,rt.x+�sa rxosunun+s. arvxee.xwxr <br />