Laserfiche WebLink
Subject: Proposed Subway, 1402 SE Everett Mall Way, Everett <br />Pebruary 8, 2008 <br />Page 2 <br />12. Plumbing must meet state and local codes. <br />13. The ventilation system shal] be installed and operated to meet applicable building, mechanical, and <br />fire codes. <br />A preoperational inspection is required prior to operating permit issuancc and approval to open <br />for business. At the time of inspection, thc construct�on of the food service establishment must be <br />complete and all equipment must be in place and in proper operating condition. Incomplete construction <br />or equipment operation may result in a$160.00 reinspection fee. Requests for a preoperational <br />inspection must be received at Icast one week in advance of thc date being requested for the <br />inspection. Contact the Food Program ofTice a minimr�m oC one week in adva�ce to schedule an <br />uppointment for the preoperational inspection. The preoperational inspection wil] ensure compliance <br />with die Rules and Re�ulations of the State Board of Health for Food Service Sanitation. <br />Changes or additions to the approved plans or equipment require pre-approval from the Snohomish <br />I-lealth District prior to implementation of the changes. <br />Please contact me iTyou have any questions. My office number is 425.339.5?50. <br />Sincerely, <br />�uy ��� �� .�,�� ��, <br />RoberEA. Hoppa, R.S. <br />�nvironmental Heal[h Specialist <br />RAH/dmb <br />Isnclosure: Food establishment operating permit application and current fee schedule <br />cc: City of Gvcretl Building DepaRment <br />Tlitan Panchel, Owner <br />�� <br />