My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1405 SE EVERETT MALL WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1405
>
BASE FILE
>
1405 SE EVERETT MALL WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 6:11:57 PM
Creation date
2/10/2017 1:37:54 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1405
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 27, 1985 <br />Mr. Larry W. Ingraham <br />Harmon and Associates <br />9725 - 3rd Ave NE, Suite 500 <br />Seattle WA 98115 <br />Subject: Everett Mall Plaza <br />Dear Mr, ingraham: <br />cirv of <br />everett <br />:_,dFc.. L��....n," '. <br />In response to your February 25, 1985, letter concerning access to the PUD right- <br />of-way, we would like to comment on a few points. <br />The overall evaluation of the area's traffic circulation was accomplished hy :hree <br />traffic studies on Everett Mall, Everett Mall Way and Everett Mall Plaza. <br />Everett ti1a11 Plaza's Traffic Circulation Study was performed by Transpo, a <br />traffic engineering group hired by your company, as part of the approval process <br />for this development. Your site plan reflects their traffic concerns and we feel <br />the access points to the PUD right-of-way are a necessary measure as required <br />by the site's Final Declaration of Non-significance. <br />The intersections and signals were designed by E�tranco, using tlie Transpo and <br />City studies. The Transpo, Entranco, and City work shows the need for access to <br />the PUD right-of-way. The system has been designed to operate with that <br />access. The issue needs a legal committment by Harmon and Associates to <br />ensure the access points are constructed once the PUD right-of-way is improved. <br />Please don't hesitate to contact us if further clarification is necessary. <br />Sincerely, <br />ALFRED R. THEAL, P.E. <br />Public Works Director/City Engineer <br />_�" <br />8y: Lar Craw d <br />Public Services Manager <br />tC/jcl <br />�� cc: Ron Cameron <br />. . -�. '- _.ir.: __ _.... <br />eu,: .r���,+:e=_ _,. .. ,.�:v _.�;,.-.- ..� ..... <br />:...=s ,. __. .�.e' . .. — .- <br />
The URL can be used to link to this page
Your browser does not support the video tag.