Laserfiche WebLink
� <br />Yee <br />N.A. <br />N.A. <br />H.A. <br />N.A. <br />N.A. <br />N.A. <br />Ye9 <br />N.A. <br />Ye9 <br />N.A. <br />N.A. <br />N.A. <br />N.A. <br />Yee <br />N.A. <br />N.A. <br />N.A. <br />N.A. <br />fl.A. <br />Yee <br />N..i. <br />N.A. <br />17.A. <br />ti. A. <br />Code Compliance Forms for Nonresidential and <br />1105 96 Bvexet[ Mell itey <br />, �c necessarv to check a mechanical <br />Information <br />1401-1424' <br />q11 EqWpmemrertorm <br />1411.1 Minimum elliciency <br />1411.1 Combustion htg. <br />1417.1 Air-cooled chiller <br />1q112.1 Water-cooledchiller <br />1411.4 Pkg. elec. htg.8 clg. <br />1411.5 �Unenclosed Heat <br />IOate 6/7/2013 <br />applicalion for compliance with the mechanical requirements in Ihe <br />pment schedule with type, capaciry•, emciency <br />;ate intermittent iqnition, Ilue/draf� damper & jacket IosE <br />�ide tolal aii and water chiller capacity <br />load and NPLV values adjusled lor any non-standard conditions <br />hoa� pumps on schedule <br />:ate ratliant heal system and occupar.cy controls <br />1q12.1 TemperaWre zones Indicate localions on plans <br />74122 Oeadband conirol InAicate 5 degr. : deadband minimum <br />;412.3 Humidityconlrol Indicatehumidistal <br />1412.4 Setback and Shulolf Indicate Ihermostal with 7 day program capability & required setback <br />1412.4.7 Dampers Indicat> damper location, leakage rate, control type, 8 max. leakage <br />1412.4.2 Optimum Scart Indicale oplimum slart conlrols <br />1412.5 Hea� pump control Indicata heal pump thermes'tant & outdoor lockout on schedule <br />1412.6 Combustion heatirg Ind�cate modulaling or staged control <br />1472.7 Balancin� Indicate balancing fealures on plans <br />1412.8 Ventilation COMroI Indicale demantl control ventilation lor high-occupancy area9 <br />�b�Z 9 Loading Dcck 8 Indicale enclosed loading dock 8 parking garaga ventilalion system <br />Gara e Vanlilction activalion and coNrol method. <br />14�2 Thermostalinterlock Indicatethermcstalinledock on plans _ <br />1432.2.1 Temperature Reset InJicate �emperature reset method <br />1413 Air/WuterEconomizcrs <br />1412.1 Sinqle zone syslems Indicate mulliple cooling stage coNml capa6dity. <br />1413.1 <br />1413.1 <br />14132 <br />1413.3 <br />1413.4 <br />:cono Operalion Indica�o 10096 capa6ili�y cn schedulz <br />Econo Operation Indicate 100°5 capacily a: a5 degF dt 8 40 deg F�vb <br />Econo �xumen Indicate max. OSA condition for design clg load 8 equipmenl <br />er(ormance data. <br />grated o, eration Indicale capability lor partial cooling <br />,�n�r�arr,� Intlicate direct evao or log atomization w/ air economizer <br />t+.n. 1414.1 Duct sealing Indicate duct design pressures, sealing, and testing requirements <br />t+. x. 141h.12 Low press. duct test Intlica�e applicable low pressure duct systems shall 6e leak testetl <br />u.n. 1414.1.3 High press. duct test Indicate high pressure duct systems shall be leak testetl, and iden <br />ihe location ol ihis ductwork �n plans <br />ta.t+. 1414.2 Duct insulation Indicate R-value ol insulation on ducl <br />t�,a, I 1q15.1 IPiping insulc:ion <br />1416 omp et on equ i <br />Yee 1476.32 System Balancing <br />Yae 1416.3.3 FunctionalTesting <br />xee 1416.3.4 Daumentation <br />Yee 1A16.3.5 Comm. Report <br />N.n. 1416A ComplianceChklist <br />Yes Mechanical Summary Form <br />R�value of insulation on <br />i air and water system balancing requiremenls <br />sequence ol operations and test procedures. <br />� 08M manuals, record dravdngs, s�all training <br />i requirements lor tinal commissioning report <br />�o buitding oflicial �pon substantial completion. <br />��Pd ane attached. Eauiomen� scheduto with types, <br />